Rocksolid Light

Welcome to novaBBS (click a section below)

mail  files  register  newsreader  groups  login

Message-ID:  

I'm going to raise an issue and stick it in your ear. -- John Foreman


aus+uk / uk.railway / Re: First National Rail Contracts

SubjectAuthor
* First National Rail ContractsAnna Noyd-Dryver
`- First National Rail ContractsRoland Perry

1
Re: First National Rail Contracts

<s8b8k8$rjr$2@dont-email.me>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=21&group=uk.railway#21

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader02.eternal-september.org!.POSTED!not-for-mail
From: ann...@noyd-dryver.com (Anna Noyd-Dryver)
Newsgroups: uk.railway
Subject: Re: First National Rail Contracts
Date: Sat, 22 May 2021 15:39:52 -0000 (UTC)
Organization: A noiseless patient Spider
Lines: 30
Message-ID: <s8b8k8$rjr$2@dont-email.me>
References: <s884t4$1ip$1@dont-email.me>
Mime-Version: 1.0
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 8bit
Injection-Date: Sat, 22 May 2021 15:39:52 -0000 (UTC)
Injection-Info: reader02.eternal-september.org; posting-host="ed92c02365c8287e43c97dcd332ce293";
logging-data="28283"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1+C7JNLbFwUxaEKIg82p9gz+DLjIv7dyqM="
User-Agent: NewsTap/5.5 (iPhone/iPod Touch)
Cancel-Lock: sha1:RP0k0jubBrLobv1fUw15R3FxNOk=
sha1:VWk3LIvnnHc3P3KZcOfbI/4CbWE=
 by: Anna Noyd-Dryver - Sat, 22 May 2021 15:39 UTC

Recliner <recliner.usenet@gmail.com> wrote:
> From
> <https://news.railbusinessdaily.com/firstgroup-signs-new-national-rail-contracts-for-south-western-railway-and-transpennine-express/>
>
> National Rail Contracts are a new contract structure for agreements between
> train operating companies and the DfT and the contracts for both SWR and
> TPE are among the first wave of NRCs to be announced. NRCs replace the
> previous revenue risk-based franchising system. The NRCs have a primary
> two-year term to the end of May 2023 for both SWR and TPE, and both have an
> option to be extended by up to two further years at the DfT’s discretion.
>
> Under the NRCs the DfT will retain all revenue risk and substantially all
> cost risk. For the Group’s 70% share of the First MTR joint venture for SWR
> the fixed management fee is £3.3m per annum and there is the opportunity to
> earn an additional fee of up to £9.9m which is the maximum attainable
> performance fee. For TPE the fixed management fee is £2.3m per annum and
> there is the opportunity to earn an additional fee of up to £5.2m which is
> the maximum attainable performance fee. The punctuality and other
> operational targets required to achieve the maximum level of performance
> fee are designed to incentivise the highest level of performance for
> customers.
>

Any thoughts of the disappearance of delay attribution are thus thoroughly
dispelled; hereby an even greater incentive to try to pass the blame to
someone else, is introduced!

Anna Noyd-Dryver

Re: First National Rail Contracts

<0s$UqWJ7YTqgFAvO@perry.uk>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=29&group=uk.railway#29

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!weretis.net!feeder8.news.weretis.net!lilly.ping.de!fu-berlin.de!uni-berlin.de!individual.net!not-for-mail
From: rol...@perry.co.uk (Roland Perry)
Newsgroups: uk.railway
Subject: Re: First National Rail Contracts
Date: Sat, 22 May 2021 17:50:03 +0100
Organization: Roland Perry
Lines: 31
Message-ID: <0s$UqWJ7YTqgFAvO@perry.uk>
References: <s884t4$1ip$1@dont-email.me> <s8b8k8$rjr$2@dont-email.me>
Mime-Version: 1.0
Content-Type: text/plain;charset=utf-8;format=flowed
Content-Transfer-Encoding: 8bit
X-Trace: individual.net rGwpkL1EAIucAxYPNMjJmAuDpnRl/GHChMRxdAneHiwtvNC4Cm
X-Orig-Path: perry.co.uk!roland
Cancel-Lock: sha1:E+wIiHTo/OnEWedF2iOCddDSLYk=
User-Agent: Turnpike/6.07-M (<5Gi5fZLx$jxkd1U9sxT62mJKIn>)
 by: Roland Perry - Sat, 22 May 2021 16:50 UTC

In message <s8b8k8$rjr$2@dont-email.me>, at 15:39:52 on Sat, 22 May
2021, Anna Noyd-Dryver <anna@noyd-dryver.com> remarked:
>>
>> National Rail Contracts are a new contract structure for agreements between
>> train operating companies and the DfT and the contracts for both SWR and
>> TPE are among the first wave of NRCs to be announced. NRCs replace the
>> previous revenue risk-based franchising system. The NRCs have a primary
>> two-year term to the end of May 2023 for both SWR and TPE, and both have an
>> option to be extended by up to two further years at the DfT’s discretion.
>>
>> Under the NRCs the DfT will retain all revenue risk and substantially all
>> cost risk. For the Group’s 70% share of the First MTR joint venture for SWR
>> the fixed management fee is £3.3m per annum and there is the opportunity to
>> earn an additional fee of up to £9.9m which is the maximum attainable
>> performance fee. For TPE the fixed management fee is £2.3m per annum and
>> there is the opportunity to earn an additional fee of up to £5.2m which is
>> the maximum attainable performance fee. The punctuality and other
>> operational targets required to achieve the maximum level of performance
>> fee are designed to incentivise the highest level of performance for
>> customers.
>
>Any thoughts of the disappearance of delay attribution are thus thoroughly
>dispelled; hereby an even greater incentive to try to pass the blame to
>someone else, is introduced!

Oh dear, did Shapps lie on prime-time TV, or was he just woefully not on
top of his brief?

400 delay-blamers he wrote off, want to know.
--
Roland Perry

1
server_pubkey.txt

rocksolid light 0.9.81
clearnet tor