Rocksolid Light

Welcome to novaBBS (click a section below)

mail  files  register  newsreader  groups  login

Message-ID:  

One family builds a wall, two families enjoy it.


aus+uk / uk.railway / Re: Portsmouth Direct closed for 9 days

SubjectAuthor
* Portsmouth Direct closed for 9 daysGraeme Wall
`* Portsmouth Direct closed for 9 daysAnna Noyd-Dryver
 `- Portsmouth Direct closed for 9 daysRoland Perry

1
Portsmouth Direct closed for 9 days

<su5aru$2b5$1@dont-email.me>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=22906&group=uk.railway#22906

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader02.eternal-september.org!.POSTED!not-for-mail
From: rai...@greywall.demon.co.uk (Graeme Wall)
Newsgroups: uk.railway
Subject: Portsmouth Direct closed for 9 days
Date: Fri, 11 Feb 2022 09:39:10 +0000
Organization: A noiseless patient Spider
Lines: 5
Message-ID: <su5aru$2b5$1@dont-email.me>
Mime-Version: 1.0
Content-Type: text/plain; charset=UTF-8; format=flowed
Content-Transfer-Encoding: 7bit
Injection-Date: Fri, 11 Feb 2022 09:39:10 -0000 (UTC)
Injection-Info: reader02.eternal-september.org; posting-host="2dc84176970340ca34bbf0d7d1fba72f";
logging-data="2405"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1+VPX84GGtk2j73l5yx/35MbqD1XgeI+8s="
User-Agent: Mozilla/5.0 (Macintosh; Intel Mac OS X 10.15; rv:91.0)
Gecko/20100101 Thunderbird/91.5.1
Cancel-Lock: sha1:waDCiGVW56DejwgjlVCM0Rb+Pm4=
Content-Language: en-GB
 by: Graeme Wall - Fri, 11 Feb 2022 09:39 UTC

<https://www.bbc.co.uk/news/uk-england-hampshire-60338304>
--
Graeme Wall
This account not read.

Re: Portsmouth Direct closed for 9 days

<su6c5v$j50$2@dont-email.me>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=23015&group=uk.railway#23015

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader02.eternal-september.org!.POSTED!not-for-mail
From: ann...@noyd-dryver.com (Anna Noyd-Dryver)
Newsgroups: uk.railway
Subject: Re: Portsmouth Direct closed for 9 days
Date: Fri, 11 Feb 2022 19:07:43 -0000 (UTC)
Organization: A noiseless patient Spider
Lines: 15
Message-ID: <su6c5v$j50$2@dont-email.me>
References: <su5aru$2b5$1@dont-email.me>
Mime-Version: 1.0
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 8bit
Injection-Date: Fri, 11 Feb 2022 19:07:43 -0000 (UTC)
Injection-Info: reader02.eternal-september.org; posting-host="fb9f9f32b8bdd6074a13ba26da9bc6a5";
logging-data="19616"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX18ZTI5y7B4hw0VF5FTL2NG5CtZ0uKNU+Zc="
User-Agent: NewsTap/5.5 (iPhone/iPod Touch)
Cancel-Lock: sha1:RC4BCyDjAqsFp05GsTBstBwsYvQ=
sha1:2AEWBdJjY0Lm/XSoOfeBNod3Kng=
 by: Anna Noyd-Dryver - Fri, 11 Feb 2022 19:07 UTC

Graeme Wall <rail@greywall.demon.co.uk> wrote:
>
> <https://www.bbc.co.uk/news/uk-england-hampshire-60338304>
>

That's a long nine days!!

"Work starting on Saturday will see a nine-day closure between Guildford
and Petersfield.
The Network Rail programme is expected to be completed by late 2024."

*rotfl*

Anna Noyd-Dryver

Re: Portsmouth Direct closed for 9 days

<ikpfqVdhDODiFAdP@perry.uk>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=23577&group=uk.railway#23577

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!weretis.net!feeder8.news.weretis.net!news.szaf.org!fu-berlin.de!uni-berlin.de!individual.net!not-for-mail
From: rol...@perry.co.uk (Roland Perry)
Newsgroups: uk.railway
Subject: Re: Portsmouth Direct closed for 9 days
Date: Wed, 16 Feb 2022 11:32:49 +0000
Organization: Roland Perry
Lines: 21
Message-ID: <ikpfqVdhDODiFAdP@perry.uk>
References: <su5aru$2b5$1@dont-email.me> <su6c5v$j50$2@dont-email.me>
Mime-Version: 1.0
Content-Type: text/plain;charset=us-ascii;format=flowed
X-Trace: individual.net X0RfUvU4djxEI/BCGlz9lgaPrTtrg5BNaSFTCDWtXx45rWEkML
X-Orig-Path: perry.co.uk!roland
Cancel-Lock: sha1:gSE6WnAki1QOLuwxa9EN33etjdI=
User-Agent: Turnpike/6.07-M (<5Rm5fFb1$jxxR1U9dxW62mVbUT>)
 by: Roland Perry - Wed, 16 Feb 2022 11:32 UTC

In message <su6c5v$j50$2@dont-email.me>, at 19:07:43 on Fri, 11 Feb
2022, Anna Noyd-Dryver <anna@noyd-dryver.com> remarked:
>Graeme Wall <rail@greywall.demon.co.uk> wrote:
>>
>> <https://www.bbc.co.uk/news/uk-england-hampshire-60338304>
>>
>
>That's a long nine days!!
>
>"Work starting on Saturday will see a nine-day closure between Guildford
>and Petersfield.
>The Network Rail programme is expected to be completed by late 2024."
>
>*rotfl*

Sounds a bit like the ECML resignalling (and Kings Cross throat
remodelling). The announcements of impeding works often had a tone of
(if you didn't know better) "this is the last push and then it'll be
done". But it never was, and closure after closure happened instead.
--
Roland Perry

1
server_pubkey.txt

rocksolid light 0.9.8
clearnet tor