Rocksolid Light

Welcome to novaBBS (click a section below)

mail  files  register  newsreader  groups  login

Message-ID:  

He who slings mud generally loses ground. -- Adlai Stevenson


aus+uk / uk.railway / Re: ETCS and CSR question

SubjectAuthor
* ETCS and CSR questionEddie King
+- ETCS and CSR questionRecliner
+* ETCS and CSR questionBob
|`- ETCS and CSR questionRobert
`- ETCS and CSR questionAnna Noyd-Dryver

1
ETCS and CSR question

<j8bs37FjrahU1@mid.individual.net>

 copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=24891&group=uk.railway#24891

 copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader02.eternal-september.org!news.uzoreto.com!fu-berlin.de!uni-berlin.de!individual.net!not-for-mail
From: xxxeddie...@gmx.net (Eddie King)
Newsgroups: uk.railway
Subject: ETCS and CSR question
Date: Thu, 3 Mar 2022 13:53:58 +0100
Lines: 9
Message-ID: <j8bs37FjrahU1@mid.individual.net>
Mime-Version: 1.0
Content-Type: text/plain; charset=UTF-8; format=flowed
Content-Transfer-Encoding: 7bit
X-Trace: individual.net IR2pbiBOlWb/5lqTtcRa+g/24u3EjYaPXlSgtToFfPr/pdXVVa
Cancel-Lock: sha1:kvNEmWdXfn1azyHJydFeK19ZLVg=
User-Agent: Mozilla/5.0 (Windows NT 6.1; Win64; x64; rv:91.0) Gecko/20100101
Thunderbird/91.6.1
 by: Eddie King - Thu, 3 Mar 2022 12:53 UTC

Hi guys, two questions for the experts.

1. what is the situation regarding ETCS on the UK rail network. Are
there any operational areas? If so at what level.

2. Is CSR still operational as I'm sure I have still seen some channel
number signs on the network, or has everything migrated to GSM-R?

Thanks very much for any info.

Re: ETCS and CSR question

<hff12h94rtbbob1jvcdra7tp7qkic3ujfs@4ax.com>

 copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=24892&group=uk.railway#24892

 copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!weretis.net!feeder8.news.weretis.net!newsreader4.netcologne.de!news.netcologne.de!peer02.ams1!peer.ams1.xlned.com!news.xlned.com!fx08.ams1.POSTED!not-for-mail
From: recliner...@gmail.com (Recliner)
Newsgroups: uk.railway
Subject: Re: ETCS and CSR question
Message-ID: <hff12h94rtbbob1jvcdra7tp7qkic3ujfs@4ax.com>
References: <j8bs37FjrahU1@mid.individual.net>
User-Agent: ForteAgent/7.20.32.1218
MIME-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
Lines: 13
X-Complaints-To: abuse@easynews.com
Organization: Forte - www.forteinc.com
X-Complaints-Info: Please be sure to forward a copy of ALL headers otherwise we will be unable to process your complaint properly.
Date: Thu, 03 Mar 2022 13:13:28 +0000
X-Received-Bytes: 1016
 by: Recliner - Thu, 3 Mar 2022 13:13 UTC

On Thu, 3 Mar 2022 13:53:58 +0100, Eddie King <xxxeddie_ce@gmx.net> wrote:

>Hi guys, two questions for the experts.
>
>1. what is the situation regarding ETCS on the UK rail network. Are
>there any operational areas?

Yes, since 2010,

> If so at what level.

Lots of info in <https://www.railengineer.co.uk/ertms-on-the-east-coast-main-line/>

Re: ETCS and CSR question

<svqin2$b90$1@dont-email.me>

 copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=24894&group=uk.railway#24894

 copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader02.eternal-september.org!.POSTED!not-for-mail
From: ema...@domain.com (Bob)
Newsgroups: uk.railway
Subject: Re: ETCS and CSR question
Date: Thu, 3 Mar 2022 15:18:10 +0100
Organization: A noiseless patient Spider
Lines: 12
Message-ID: <svqin2$b90$1@dont-email.me>
References: <j8bs37FjrahU1@mid.individual.net>
Mime-Version: 1.0
Content-Type: text/plain; charset=iso-8859-1; format=flowed
Content-Transfer-Encoding: 8bit
Injection-Info: reader02.eternal-september.org; posting-host="58a33808956121e80cca8c265e87844a";
logging-data="11552"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1/FeLJLGkKzvSyav8sJUUKkcS1QzNV2etM="
User-Agent: Unison/2.1.10
Cancel-Lock: sha1:Z8gjmD6i37bvJXZ9BDT4ztCCSAE=
 by: Bob - Thu, 3 Mar 2022 14:18 UTC

On 2022-03-03 12:53:58 +0000, Eddie King said:

> Hi guys, two questions for the experts.
>
> 1. what is the situation regarding ETCS on the UK rail network. Are
> there any operational areas? If so at what level.

Currently in operation on the Cambrian line and the Thameslink core,
being installed on the southern ECML.

Robin

Re: ETCS and CSR question

<svr1lb$g7b$1@dont-email.me>

 copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=24906&group=uk.railway#24906

 copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader02.eternal-september.org!.POSTED!not-for-mail
From: ann...@noyd-dryver.com (Anna Noyd-Dryver)
Newsgroups: uk.railway
Subject: Re: ETCS and CSR question
Date: Thu, 3 Mar 2022 18:33:15 -0000 (UTC)
Organization: A noiseless patient Spider
Lines: 13
Message-ID: <svr1lb$g7b$1@dont-email.me>
References: <j8bs37FjrahU1@mid.individual.net>
Mime-Version: 1.0
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 8bit
Injection-Date: Thu, 3 Mar 2022 18:33:15 -0000 (UTC)
Injection-Info: reader02.eternal-september.org; posting-host="881037663ddae47c38deff5c952b5643";
logging-data="16619"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX197s96fQyPnK/lTgjPRN9RJj/Ez8jOYhuA="
User-Agent: NewsTap/5.5 (iPhone/iPod Touch)
Cancel-Lock: sha1:0IWeIrKp9yeMjTQ+cUT2EGL25ZA=
sha1:i9nXNdd7670V1XXagaC/e8EeWeo=
 by: Anna Noyd-Dryver - Thu, 3 Mar 2022 18:33 UTC

Eddie King <xxxeddie_ce@gmx.net> wrote:
>
> 2. Is CSR still operational as I'm sure I have still seen some channel
> number signs on the network, or has everything migrated to GSM-R?
>
>

All GSM-R now AFAIK, though much legacy NRN signage remains so presumably
there's legacy CSR signage left around too.

Anna Noyd-Dryver

Re: ETCS and CSR question

<t005tl$u1r$1@dont-email.me>

 copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=24963&group=uk.railway#24963

 copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader02.eternal-september.org!.POSTED!not-for-mail
From: copperca...@gmail.com (Robert)
Newsgroups: uk.railway
Subject: Re: ETCS and CSR question
Date: Sat, 5 Mar 2022 17:16:37 -0000 (UTC)
Organization: A noiseless patient Spider
Lines: 17
Message-ID: <t005tl$u1r$1@dont-email.me>
References: <j8bs37FjrahU1@mid.individual.net> <svqin2$b90$1@dont-email.me>
Mime-Version: 1.0
Content-Type: text/plain; charset=utf-8; format=fixed
Content-Transfer-Encoding: 8bit
Injection-Date: Sat, 5 Mar 2022 17:16:37 -0000 (UTC)
Injection-Info: reader02.eternal-september.org; posting-host="b60d16643a61982274f0b9096013ba89";
logging-data="30779"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1++N1nDBgHrXDVjFwsXC4qvtuVnvKkICS8="
User-Agent: Usenapp/1.18/l for MacOS - Full License
Cancel-Lock: sha1:SZaUguUodpNwXUzZI+0/dwyhdRs=
 by: Robert - Sat, 5 Mar 2022 17:16 UTC

On 3 Mar 2022 at 14:18:10 GMT, "Bob" <email@domain.com> wrote:

> On 2022-03-03 12:53:58 +0000, Eddie King said:
>
>> Hi guys, two questions for the experts.
>>
>> 1. what is the situation regarding ETCS on the UK rail network. Are
>> there any operational areas? If so at what level.
>
> Currently in operation on the Cambrian line and the Thameslink core,
> being installed on the southern ECML.
>
> Robin

And the Heathrow airport branch tunnels.
--
Robert

1
server_pubkey.txt

rocksolid light 0.9.7
clearnet tor