Rocksolid Light

Welcome to novaBBS (click a section below)

mail  files  register  newsreader  groups  login

Message-ID:  

It's not whether you win or lose, it's how you look playing the game.


aus+uk / uk.railway / Re: Market Harborough station upgrade gets bogged down

SubjectAuthor
* Market Harborough station upgrade gets bogged downTweed
+- Market Harborough station upgrade gets bogged downNobody
`* Market Harborough station upgrade gets bogged downRoland Perry
 `* Market Harborough station upgrade gets bogged downLaurence Taylor
  `* Market Harborough station upgrade gets bogged downRoland Perry
   `- Market Harborough station upgrade gets bogged downMB

1
Market Harborough station upgrade gets bogged down

<t9i6nh$1gsl6$1@dont-email.me>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=32999&group=uk.railway#32999

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!usenet.goja.nl.eu.org!news.freedyn.de!eternal-september.org!reader01.eternal-september.org!.POSTED!not-for-mail
From: usenet.t...@gmail.com (Tweed)
Newsgroups: uk.railway
Subject: Market Harborough station upgrade gets bogged down
Date: Wed, 29 Jun 2022 18:47:13 -0000 (UTC)
Organization: A noiseless patient Spider
Lines: 16
Message-ID: <t9i6nh$1gsl6$1@dont-email.me>
MIME-Version: 1.0
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 8bit
Injection-Date: Wed, 29 Jun 2022 18:47:13 -0000 (UTC)
Injection-Info: reader01.eternal-september.org; posting-host="b5e746616498cda59490a9b50236d681";
logging-data="1602214"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX19jso0DYkg3xVq+SXXbCtOZ"
User-Agent: NewsTap/5.5 (iPad)
Cancel-Lock: sha1:7aFvUhZdVlcscHmBw7tuXt3qxLs=
sha1:xE8Z9/Uje5i4kARtEudxGO63y3k=
 by: Tweed - Wed, 29 Jun 2022 18:47 UTC

https://www.harboroughmail.co.uk/news/people/after-a-three-year-wait-opening-of-new-toilets-at-harborough-railway-station-will-be-delayed-again-this-time-over-the-size-of-the-cubicles-3749793

New toilets set to be opened at Market Harborough railway station tomorrow
(Thursday) after three years have suffered a last-ditch hold-up – over the
size of the cubicles.

The new lavatories were due to be finally thrown open to passengers and
visitors after they’ve been forced to use temporary loos at the crucial
local transport hub since the summer of 2019.

But the new toilets and waiting room on the northbound platform will now be
delayed for several weeks after final tests last Friday highlighted the
latest problem.

People don’t have enough room to walk past when the cubicle doors are open,
the Network Rail site visit showed.

Re: Market Harborough station upgrade gets bogged down

<h1ipbhpql8ilc4s9068cb3mlp7q0ot9st2@4ax.com>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=33008&group=uk.railway#33008

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!aioe.org!eternal-september.org!reader01.eternal-september.org!.POSTED!not-for-mail
From: joc...@soccer.com (Nobody)
Newsgroups: uk.railway
Subject: Re: Market Harborough station upgrade gets bogged down
Date: Wed, 29 Jun 2022 14:47:17 -0700
Organization: A noiseless patient Spider
Lines: 22
Message-ID: <h1ipbhpql8ilc4s9068cb3mlp7q0ot9st2@4ax.com>
References: <t9i6nh$1gsl6$1@dont-email.me>
MIME-Version: 1.0
Content-Type: text/plain; charset=utf-8
Content-Transfer-Encoding: 8bit
Injection-Info: reader01.eternal-september.org; posting-host="d60c7c0ec8954504987d2300da80f94b";
logging-data="1637645"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1+avqhKKoIfY14kFzMdCDxg"
User-Agent: ForteAgent/8.00.32.1272
Cancel-Lock: sha1:SzS5nrWqdvFtWbJdEORreRMqKto=
 by: Nobody - Wed, 29 Jun 2022 21:47 UTC

On Wed, 29 Jun 2022 18:47:13 -0000 (UTC), Tweed
<usenet.tweed@gmail.com> wrote:

>https://www.harboroughmail.co.uk/news/people/after-a-three-year-wait-opening-of-new-toilets-at-harborough-railway-station-will-be-delayed-again-this-time-over-the-size-of-the-cubicles-3749793
>
>New toilets set to be opened at Market Harborough railway station tomorrow
>(Thursday) after three years have suffered a last-ditch hold-up – over the
>size of the cubicles.
>
>The new lavatories were due to be finally thrown open to passengers and
>visitors after they’ve been forced to use temporary loos at the crucial
>local transport hub since the summer of 2019.
>
>But the new toilets and waiting room on the northbound platform will now be
>delayed for several weeks after final tests last Friday highlighted the
>latest problem.
>
>People don’t have enough room to walk past when the cubicle doors are open,
>the Network Rail site visit showed.

Use curtain in lieu of... oops.

Re: Market Harborough station upgrade gets bogged down

<O0Om7JkU1ZviFAIb@perry.uk>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=33081&group=uk.railway#33081

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!weretis.net!feeder8.news.weretis.net!news.szaf.org!fu-berlin.de!uni-berlin.de!individual.net!not-for-mail
From: rol...@perry.co.uk (Roland Perry)
Newsgroups: uk.railway
Subject: Re: Market Harborough station upgrade gets bogged down
Date: Thu, 30 Jun 2022 13:55:48 +0100
Organization: Roland Perry
Lines: 24
Message-ID: <O0Om7JkU1ZviFAIb@perry.uk>
References: <t9i6nh$1gsl6$1@dont-email.me>
Mime-Version: 1.0
Content-Type: text/plain;charset=utf-8;format=flowed
Content-Transfer-Encoding: 8bit
X-Trace: individual.net wv8+1n9tBWR3DBeNPB4qLgrlvsux5OmR1Y4is1urmOwx9ISiKQ
X-Orig-Path: perry.co.uk!roland
Cancel-Lock: sha1:n7Rge/EdbGS6i3Ikv4AHnfD6nlw=
User-Agent: Turnpike/6.07-M (<52l5fZdV$jhVf1U93hT62mJV+y>)
 by: Roland Perry - Thu, 30 Jun 2022 12:55 UTC

In message <t9i6nh$1gsl6$1@dont-email.me>, at 18:47:13 on Wed, 29 Jun
2022, Tweed <usenet.tweed@gmail.com> remarked:
>https://www.harboroughmail.co.uk/news/people/after-a-three-year-wait-ope
>ning-of-new-toilets-at-harborough-railway-station-will-be-delayed-again-
>this-time-over-the-size-of-the-cubicles-3749793
>
>New toilets set to be opened at Market Harborough railway station tomorrow
>(Thursday) after three years have suffered a last-ditch hold-up – over the
>size of the cubicles.
>
>The new lavatories were due to be finally thrown open to passengers and
>visitors after they’ve been forced to use temporary loos at the crucial
>local transport hub since the summer of 2019.
>
>But the new toilets and waiting room on the northbound platform will now be
>delayed for several weeks after final tests last Friday highlighted the
>latest problem.
>
>People don’t have enough room to walk past when the cubicle doors are open,
>the Network Rail site visit showed.

And they can't wait ten seconds until the door is shut?
--
Roland Perry

Re: Market Harborough station upgrade gets bogged down

<crSdnYMBQsHGPCD_nZ2dnUU7-aPNnZ2d@brightview.co.uk>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=33083&group=uk.railway#33083

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!weretis.net!feeder6.news.weretis.net!news.misty.com!border2.nntp.dca1.giganews.com!nntp.giganews.com!buffer2.nntp.dca1.giganews.com!nntp.brightview.co.uk!news.brightview.co.uk.POSTED!not-for-mail
NNTP-Posting-Date: Thu, 30 Jun 2022 08:12:59 -0500
Date: Thu, 30 Jun 2022 14:13:00 +0100
From: laure...@nospam.plus.com (Laurence Taylor)
Reply-To: "[my_first_name]"@iapetus.plus.com
User-Agent: Mozilla/5.0 (Windows NT 6.1; WOW64; rv:31.0) Gecko/20100101 Thunderbird/31.0
MIME-Version: 1.0
Newsgroups: uk.railway
Subject: Re: Market Harborough station upgrade gets bogged down
References: <t9i6nh$1gsl6$1@dont-email.me> <O0Om7JkU1ZviFAIb@perry.uk>
In-Reply-To: <O0Om7JkU1ZviFAIb@perry.uk>
Content-Type: text/plain; charset=windows-1252
Content-Transfer-Encoding: 8bit
Message-ID: <crSdnYMBQsHGPCD_nZ2dnUU7-aPNnZ2d@brightview.co.uk>
Lines: 21
X-Usenet-Provider: http://www.giganews.com
X-Trace: sv3-LvcAqQCf2t97PNcP3/vxrTbsNJuYUB8iLl6OeRu6tNtja+K0Oid9Z8HR0/XcmvE6k/7eMotmQ0Y4w/W!Q10seXrxM1Sh06r4QAjuJTPVhKjUSlFcAF7gyxh75lAE0pMz2dZSEPEoAMQ4Udrj6qG3FWk8itBO!/izi0+LiyBs5rSuXroJWXUtEzw==
X-Abuse-and-DMCA-Info: Please be sure to forward a copy of ALL headers
X-Abuse-and-DMCA-Info: Otherwise we will be unable to process your complaint properly
X-Postfilter: 1.3.40
X-Original-Bytes: 1774
 by: Laurence Taylor - Thu, 30 Jun 2022 13:13 UTC

On 30/06/2022 13:55, Roland Perry wrote:

>> People don’t have enough room to walk past when the cubicle doors are open,
>> the Network Rail site visit showed.
>
> And they can't wait ten seconds until the door is shut?

Perhaps the problem is the space inside the cubicle, so you can't walk
between the door and the pan. This is not an uncommon problem' I've seen
toilets where it was necessary to stand behind the pan to close (and
subsequently open) the door.

--
rgds
LAurence
<><

Computers follow your orders, not your intentions.
~~~ Random (signature) 1.6.1

Re: Market Harborough station upgrade gets bogged down

<kkqs$EoFcaviFAdy@perry.uk>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=33090&group=uk.railway#33090

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!paganini.bofh.team!weretis.net!feeder8.news.weretis.net!lilly.ping.de!fu-berlin.de!uni-berlin.de!individual.net!not-for-mail
From: rol...@perry.co.uk (Roland Perry)
Newsgroups: uk.railway
Subject: Re: Market Harborough station upgrade gets bogged down
Date: Thu, 30 Jun 2022 14:37:09 +0100
Organization: Roland Perry
Lines: 23
Message-ID: <kkqs$EoFcaviFAdy@perry.uk>
References: <t9i6nh$1gsl6$1@dont-email.me> <O0Om7JkU1ZviFAIb@perry.uk>
<crSdnYMBQsHGPCD_nZ2dnUU7-aPNnZ2d@brightview.co.uk>
Mime-Version: 1.0
Content-Type: text/plain;charset=utf-8;format=flowed
Content-Transfer-Encoding: 8bit
X-Trace: individual.net Oqhd/iPksJBcgI7FKUs8dA4XeOM57pRebxF99E/lQJ+tpW0Soc
X-Orig-Path: perry.co.uk!roland
Cancel-Lock: sha1:82qRADknkpQzv+URYXNtB+ef76w=
User-Agent: Turnpike/6.07-M (<5xj5fFN1$jhQR1U9PhW62mVNOF>)
 by: Roland Perry - Thu, 30 Jun 2022 13:37 UTC

In message <crSdnYMBQsHGPCD_nZ2dnUU7-aPNnZ2d@brightview.co.uk>, at
14:13:00 on Thu, 30 Jun 2022, Laurence Taylor <laurence@nospam.plus.com>
remarked:
>On 30/06/2022 13:55, Roland Perry wrote:
>
>>> People don’t have enough room to walk past when the cubicle doors are open,
>>> the Network Rail site visit showed.
>>
>> And they can't wait ten seconds until the door is shut?
>
>Perhaps the problem is the space inside the cubicle, so you can't walk
>between the door and the pan. This is not an uncommon problem' I've seen
>toilets where it was necessary to stand behind the pan to close (and
>subsequently open) the door.

So pax are "doing their business" inside the cubicle with the door
open, because it's not possible to close it? If that's the case (ie
infringement of privacy, not delaying other pax) why not say so.

And can someone please fire the architect and building regs inspector
who were involved in perpetrating this plan.
--
Roland Perry

Re: Market Harborough station upgrade gets bogged down

<t9kcut$1uckj$1@dont-email.me>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=33095&group=uk.railway#33095

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader01.eternal-september.org!.POSTED!not-for-mail
From: MB...@nospam.net (MB)
Newsgroups: uk.railway
Subject: Re: Market Harborough station upgrade gets bogged down
Date: Thu, 30 Jun 2022 15:45:49 +0100
Organization: A noiseless patient Spider
Lines: 6
Message-ID: <t9kcut$1uckj$1@dont-email.me>
References: <t9i6nh$1gsl6$1@dont-email.me> <O0Om7JkU1ZviFAIb@perry.uk>
<crSdnYMBQsHGPCD_nZ2dnUU7-aPNnZ2d@brightview.co.uk>
<kkqs$EoFcaviFAdy@perry.uk>
MIME-Version: 1.0
Content-Type: text/plain; charset=UTF-8; format=flowed
Content-Transfer-Encoding: 7bit
Injection-Date: Thu, 30 Jun 2022 14:45:49 -0000 (UTC)
Injection-Info: reader01.eternal-september.org; posting-host="8a188b54f17950af80552e7340139dad";
logging-data="2044563"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX18NDMwD5+j1UmaO6J6rlZUO"
User-Agent: Mozilla/5.0 (Windows NT 10.0; Win64; x64; rv:91.0) Gecko/20100101
Thunderbird/91.11.0
Cancel-Lock: sha1:675Ps9scnL7cJkNNe+BOzeruX/w=
In-Reply-To: <kkqs$EoFcaviFAdy@perry.uk>
 by: MB - Thu, 30 Jun 2022 14:45 UTC

On 30/06/2022 14:37, Roland Perry wrote:
> And can someone please fire the architect and building regs inspector
> who were involved in perpetrating this plan.

They will find someone else to blame it on.

1
server_pubkey.txt

rocksolid light 0.9.81
clearnet tor