MML Electrification to South Wigston

<tbe76t$34prj$1@dont-email.me>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=34950&group=uk.railway#34950

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader01.eternal-september.org!.POSTED!not-for-mail
From: usenet.t...@gmail.com (Tweed)
Newsgroups: uk.railway
Subject: MML Electrification to South Wigston
Date: Fri, 22 Jul 2022 13:03:25 -0000 (UTC)
Organization: A noiseless patient Spider
Lines: 10
Message-ID: <tbe76t$34prj$1@dont-email.me>
MIME-Version: 1.0
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 8bit
Injection-Date: Fri, 22 Jul 2022 13:03:25 -0000 (UTC)
Injection-Info: reader01.eternal-september.org; posting-host="dd96576eee0d3a6899dbbe3fe72ec8ac";
logging-data="3303283"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX18oCAeCIWS8pnZKW32fo/Hx"
User-Agent: NewsTap/5.5 (iPad)
Cancel-Lock: sha1:8ApRhqmb9tpwlGiBTrKjfC+cjXE=
sha1:fCh5lqnj2SaAEPuh9jGVDR32i1g=
 by: Tweed - Fri, 22 Jul 2022 13:03 UTC

https://www.networkrail.co.uk/running-the-railway/our-routes/east-midlands/midland-main-line-upgrade/

There a moderately interesting video of the presentation to local
residents. The bit that struck me was that the piling is going to be done
with relatively simple plant, none of the fancy multi million pound high
output trains that didn’t go so well elsewhere.

This firm seem to be doing the bulk of the work
https://www.powerlines-group.com/spl/spl_uk.nsf

Re: MML Electrification to South Wigston

<tbeco7$m3b$1@gioia.aioe.org>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=34956&group=uk.railway#34956

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!aioe.org!BKzeqmo2UYxb4eR2zKm0zw.user.46.165.242.75.POSTED!not-for-mail
From: Mutt...@dastardlyhq.com
Newsgroups: uk.railway
Subject: Re: MML Electrification to South Wigston
Date: Fri, 22 Jul 2022 14:37:59 -0000 (UTC)
Organization: Aioe.org NNTP Server
Message-ID: <tbeco7$m3b$1@gioia.aioe.org>
References: <tbe76t$34prj$1@dont-email.me>
Injection-Info: gioia.aioe.org; logging-data="22635"; posting-host="BKzeqmo2UYxb4eR2zKm0zw.user.gioia.aioe.org"; mail-complaints-to="abuse@aioe.org";
X-Notice: Filtered by postfilter v. 0.9.2
 by: Mutt...@dastardlyhq.com - Fri, 22 Jul 2022 14:37 UTC

On Fri, 22 Jul 2022 13:03:25 -0000 (UTC)
Tweed <usenet.tweed@gmail.com> wrote:
>https://www.networkrail.co.uk/running-the-railway/our-routes/east-midlands/midl
>and-main-line-upgrade/

So is electrification to Nottingham is going ahead or is it just wishful
thinking? If so when did it get approval?

Re: MML Electrification to South Wigston

<ZdKdnS2EMp8BVUf_nZ2dnUU7-ImdnZ2d@brightview.co.uk>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=34957&group=uk.railway#34957

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!weretis.net!feeder8.news.weretis.net!news.mixmin.net!border2.nntp.dca1.giganews.com!nntp.giganews.com!buffer2.nntp.dca1.giganews.com!buffer1.nntp.dca1.giganews.com!nntp.brightview.co.uk!news.brightview.co.uk.POSTED!not-for-mail
NNTP-Posting-Date: Fri, 22 Jul 2022 10:56:11 -0500
From: ala...@darkroom.+.com (Alan)
Subject: Re: MML Electrification to South Wigston
Newsgroups: uk.railway
References: <tbe76t$34prj$1@dont-email.me> <tbeco7$m3b$1@gioia.aioe.org>
User-Agent: Pan/0.139 (Sexual Chocolate; GIT bf56508
git://git.gnome.org/pan2)
MIME-Version: 1.0
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 8bit
Message-ID: <ZdKdnS2EMp8BVUf_nZ2dnUU7-ImdnZ2d@brightview.co.uk>
Date: Fri, 22 Jul 2022 10:56:12 -0500
Lines: 18
X-Usenet-Provider: http://www.giganews.com
X-Trace: sv3-KYjSKoqOtkUSXOwUJNbw2sruVptfYIce4Hmjm5J02llPBK9RlwAy+o1ydLiO1LCbhahPeSeJwsBSFaF!PStFaws/aXG1qsr/otBYPKlGo0SYzZEOKjVfeVQA1/Wo9PiHOk/tdEendIjL/kOgzc8+7bAgVp5W!r3ZNci28t2um6orDp/h028OCMA==
X-Abuse-and-DMCA-Info: Please be sure to forward a copy of ALL headers
X-Abuse-and-DMCA-Info: Otherwise we will be unable to process your complaint properly
X-Postfilter: 1.3.40
X-Original-Bytes: 1902
 by: Alan - Fri, 22 Jul 2022 15:56 UTC

On Fri, 22 Jul 2022 14:37:59 +0000, Muttley wrote:

> On Fri, 22 Jul 2022 13:03:25 -0000 (UTC)
> Tweed <usenet.tweed@gmail.com> wrote:
>>https://www.networkrail.co.uk/running-the-railway/our-routes/east-
midlands/midl
>>and-main-line-upgrade/
>
> So is electrification to Nottingham is going ahead or is it just wishful
> thinking? If so when did it get approval?

It's going ahead. I think, iirc, there are 17 contracts going out for the
electrification, it is all divided into roughly 10 -20 mile sections,
with a 1.5 mile section at Sheffield being the smallest.
The bridges south of Leicester have all been cleared and modified in the
original phase, the London Road bridge at Leicester is a very low one,
which is not being wired, but probably a conductor rail will be fitted,
like in the Severn Tunnel and other places.

Re: MML Electrification to South Wigston

<tbei92$37lqh$1@dont-email.me>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=34959&group=uk.railway#34959

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader01.eternal-september.org!.POSTED!not-for-mail
From: usenet.t...@gmail.com (Tweed)
Newsgroups: uk.railway
Subject: Re: MML Electrification to South Wigston
Date: Fri, 22 Jul 2022 16:12:18 -0000 (UTC)
Organization: A noiseless patient Spider
Lines: 25
Message-ID: <tbei92$37lqh$1@dont-email.me>
References: <tbe76t$34prj$1@dont-email.me>
<tbeco7$m3b$1@gioia.aioe.org>
<ZdKdnS2EMp8BVUf_nZ2dnUU7-ImdnZ2d@brightview.co.uk>
MIME-Version: 1.0
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 8bit
Injection-Date: Fri, 22 Jul 2022 16:12:18 -0000 (UTC)
Injection-Info: reader01.eternal-september.org; posting-host="dd96576eee0d3a6899dbbe3fe72ec8ac";
logging-data="3397457"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1/h9y4Z2m/AQgoPfR+Hhtpr"
User-Agent: NewsTap/5.5 (iPad)
Cancel-Lock: sha1:va1in87KaTnWPnUwOMZ8aJPaAaU=
sha1:a7Kr6d6JQXWfPrYCGkRwcYw+STY=
 by: Tweed - Fri, 22 Jul 2022 16:12 UTC

Alan <alan@darkroom.+.com> wrote:
> On Fri, 22 Jul 2022 14:37:59 +0000, Muttley wrote:
>
>> On Fri, 22 Jul 2022 13:03:25 -0000 (UTC)
>> Tweed <usenet.tweed@gmail.com> wrote:
>>> https://www.networkrail.co.uk/running-the-railway/our-routes/east-
> midlands/midl
>>> and-main-line-upgrade/
>>
>> So is electrification to Nottingham is going ahead or is it just wishful
>> thinking? If so when did it get approval?
>
> It's going ahead. I think, iirc, there are 17 contracts going out for the
> electrification, it is all divided into roughly 10 -20 mile sections,
> with a 1.5 mile section at Sheffield being the smallest.
> The bridges south of Leicester have all been cleared and modified in the
> original phase, the London Road bridge at Leicester is a very low one,
> which is not being wired, but probably a conductor rail will be fitted,
> like in the Severn Tunnel and other places.
>

This is the most detail I can find

https://www.constructionnews.co.uk/civils/work-up-for-grabs-on-1-3bn-midland-main-line-electrification-scheme-24-05-2022/

Re: MML Electrification to South Wigston

<drbtqi-i35.ln1@castle.rilynn.me.uk>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=34982&group=uk.railway#34982

  copy link   Newsgroups: uk.railway
Path: i2pn2.org!i2pn.org!eternal-september.org!reader01.eternal-september.org!.POSTED!not-for-mail
From: use...@rilynn.me.uk (Roger Lynn)
Newsgroups: uk.railway
Subject: Re: MML Electrification to South Wigston
Date: Sat, 23 Jul 2022 15:06:05 +0100
Organization: A noiseless patient Spider
Lines: 22
Message-ID: <drbtqi-i35.ln1@castle.rilynn.me.uk>
References: <tbe76t$34prj$1@dont-email.me> <tbeco7$m3b$1@gioia.aioe.org>
<ZdKdnS2EMp8BVUf_nZ2dnUU7-ImdnZ2d@brightview.co.uk>
MIME-Version: 1.0
Content-Type: text/plain; charset=us-ascii; format=flowed
Content-Transfer-Encoding: 7bit
Injection-Info: reader01.eternal-september.org; posting-host="0bb7e5c4d0a22a1b097243cc9d6f4a66";
logging-data="4119257"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1+7M4teTEEv05eBtZtGRZfU"
User-Agent: Mozilla/5.0 (X11; Linux x86_64; rv:68.0) Gecko/20100101
SeaMonkey/2.53.13
Cancel-Lock: sha1:kJyAEHysCnz0gBFpjKBh0RHi3pA=
In-Reply-To: <ZdKdnS2EMp8BVUf_nZ2dnUU7-ImdnZ2d@brightview.co.uk>
 by: Roger Lynn - Sat, 23 Jul 2022 14:06 UTC

On 22/07/2022 16:56, Alan wrote:
> On Fri, 22 Jul 2022 14:37:59 +0000, Muttley wrote:
>> On Fri, 22 Jul 2022 13:03:25 -0000 (UTC)
>> Tweed <usenet.tweed@gmail.com> wrote:
>>>https://www.networkrail.co.uk/running-the-railway/our-routes/east-
> midlands/midl
>>>and-main-line-upgrade/
>>
>> So is electrification to Nottingham is going ahead or is it just wishful
>> thinking? If so when did it get approval?
>
> It's going ahead. I think, iirc, there are 17 contracts going out for the
> electrification, it is all divided into roughly 10 -20 mile sections,
> with a 1.5 mile section at Sheffield being the smallest.
> The bridges south of Leicester have all been cleared and modified in the
> original phase, the London Road bridge at Leicester is a very low one,
> which is not being wired, but probably a conductor rail will be fitted,
> like in the Severn Tunnel and other places.

Presumably they won't be doing anything sensible, such as connecting the
relatively short distance from Sheffield to South Kirkby (for Wakefield) or
Doncaster?