Rocksolid Light

Welcome to novaBBS (click a section below)

mail  files  register  newsreader  groups  login

Message-ID:  

Come, muse, let us sing of rats! -- From a poem by James Grainger, 1721-1767


aus+uk / uk.rec.cycling / Re: Humber Bridge footpaths to finally reopen after more than a month

SubjectAuthor
o Re: Humber Bridge footpaths to finally reopen after more than a monthswldx...@gmail.com

1
Re: Humber Bridge footpaths to finally reopen after more than a month

<a6f2df54-9ca3-4939-83fb-bafa107e9f78n@googlegroups.com>

  copy mid

https://www.novabbs.com/aus+uk/article-flat.php?id=484&group=uk.rec.cycling#484

  copy link   Newsgroups: uk.rec.cycling
X-Received: by 2002:ac8:134b:: with SMTP id f11mr28477379qtj.10.1620231892612;
Wed, 05 May 2021 09:24:52 -0700 (PDT)
X-Received: by 2002:a05:622a:1114:: with SMTP id e20mr28750542qty.181.1620231892477;
Wed, 05 May 2021 09:24:52 -0700 (PDT)
Path: i2pn2.org!i2pn.org!weretis.net!feeder8.news.weretis.net!proxad.net!feeder1-2.proxad.net!209.85.160.216.MISMATCH!news-out.google.com!nntp.google.com!postnews.google.com!google-groups.googlegroups.com!not-for-mail
Newsgroups: uk.rec.cycling
Date: Wed, 5 May 2021 09:24:52 -0700 (PDT)
In-Reply-To: <65219be0-041a-43ee-b0b0-9981bdb02a49n@googlegroups.com>
Injection-Info: google-groups.googlegroups.com; posting-host=51.9.54.143; posting-account=C0YVfQoAAABh4p4NE_bEvMV8znsP81Ld
NNTP-Posting-Host: 51.9.54.143
References: <65219be0-041a-43ee-b0b0-9981bdb02a49n@googlegroups.com>
User-Agent: G2/1.0
MIME-Version: 1.0
Message-ID: <a6f2df54-9ca3-4939-83fb-bafa107e9f78n@googlegroups.com>
Subject: Re: Humber Bridge footpaths to finally reopen after more than a month
From: swldxer1...@gmail.com (swldx...@gmail.com)
Injection-Date: Wed, 05 May 2021 16:24:52 +0000
Content-Type: text/plain; charset="UTF-8"
Content-Transfer-Encoding: quoted-printable
 by: swldx...@gmail.com - Wed, 5 May 2021 16:24 UTC

On Wednesday, May 5, 2021 at 2:32:02 PM UTC+1, swldx...@gmail.com wrote:

Now also on road.cc

Walkways on the Humber Bridge will reopen tomorrow, according to a local Member of Parliament, enabling people who cross it on foot or by bike, including to get to and from work, to enjoy full access again.

On 3 April and with no notice, the bridge’s owners and operators, The Humber Bridge Board, blocked access to the walkways following several suicides in the preceding weeks.

While the decision to close the walkways was understandable given the circumstances, there was criticism over no alternative arrangements being put in place, with the only alternative road route to cross the estuary involving a 60-mile detour.

Limited access was subsequently restored in mid-April, but as Cycling UK noted, it was not clear how the system worked, nor was there any mention of it on the bridge’s website, and Kingston upon Hull West and Hessle MP Emma Hardy asked for clarification on whether people needed to register to use such a service.

In a Facebook post this morning, Hardy confirmed that the bridge’s walkways would reopen daily from 5am to 9pm. People wanting access outside those times will need to contact the Humber Bridge Board.

🔥🔥Good News!🔥🔥 As you know, I’ve been meeting with the Chair of the Humber Bridge Board weekly since the walkway was...

Posted by Emma Hardy MP (link is external) on Tuesday, 4 May 2021 (link is external)

Cycling UK’s head of campaigns Duncan Dollimore said: “For over a month the Humber Bridge has been closed to all pedestrians and anyone cycling save for those commuter cyclists who managed to get through a cumbersome registration process, so a partial re-opening tomorrow is welcome progress.

“But the tragic loss of life along the bridge has been a chronic problem for over a decade, requiring investment in long term infrastructure and intervention measures, whilst banning people on foot or a bike from crossing the bridge was only ever a knee jerk reaction which didn’t address the causes or long-term solutions.

“Cycling UK hopes that the Humber Bridge Board will at last recognise the importance of maintaining cycle and pedestrian access whilst improving suicide prevention measures, and if they must have a registration system for people to cross, make it simple, easily accessible, with registration and other restrictions being time limited rather than permanent,” he added.

https://road.cc/content/news/humber-bridge-walkways-reopen-tomorrow-283089


aus+uk / uk.rec.cycling / Re: Humber Bridge footpaths to finally reopen after more than a month

1
server_pubkey.txt

rocksolid light 0.9.81
clearnet tor