Rocksolid Light

Welcome to novaBBS (click a section below)

mail  files  register  newsreader  groups  login

Message-ID:  

...Unix, MS-DOS, and Windows NT (also known as the Good, the Bad, and the Ugly). -- Matt Welsh


tech / rec.aviation.military / Re: WWII Weapons cost, mostly aircraft.

Re: WWII Weapons cost, mostly aircraft.

<585ensuyg7xp.q6y7z49jq402.dlg@40tude.net>

  copy mid

https://www.novabbs.com/tech/article-flat.php?id=2816&group=rec.aviation.military#2816

  copy link   Newsgroups: rec.aviation.military
Path: rocksolid2!news.neodome.net!weretis.net!feeder8.news.weretis.net!eternal-september.org!reader02.eternal-september.org!.POSTED!not-for-mail
From: Solom...@citi.com (SolomonW)
Newsgroups: rec.aviation.military
Subject: Re: WWII Weapons cost, mostly aircraft.
Date: Sun, 10 Oct 2021 12:18:39 +1100
Organization: Truth with honesty
Lines: 643
Message-ID: <585ensuyg7xp.q6y7z49jq402.dlg@40tude.net>
References: <sjs2hi$mvb$1@dont-email.me>
Mime-Version: 1.0
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: 7bit
Injection-Info: reader02.eternal-september.org; posting-host="f33a261235de4389b62652bec470d96a";
logging-data="30502"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1/clFGtPiSkOR8KiXnyK8AkUKe0NQXUUYM="
User-Agent: 40tude_Dialog/2.0.15.1
Cancel-Lock: sha1:XhxUGvXzT+0f3wbpRsAsx1rySP0=
 by: SolomonW - Sun, 10 Oct 2021 01:18 UTC

On Sat, 9 Oct 2021 23:38:10 +1100, Geoffrey Sinclair wrote:

> Aircraft Unit costs, US Archives RG18 E 10 B 68, CF Contractor Furnished,
> GFE Government Furnished Equipment
> Date / Model / Airframe / Engines(s) / Propeller(s) / GFE / Ordnance /
> Communications / Total / Notes
> 28-Feb-43 / B-29 / $362,347 / $101,685 / $10,328 / $125,341 /
> $4,836 / $34,738 / $639,275 / Costs based on weighted average of
> uncompleted contracts
> 28-Feb-43 / B-32 / $522,613 / $101,685 / $23,310 / $68,947 / $3,247
> / $34,150 / $753,952 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / B-17 / $111,443 / $34,287 / $3,400 / $45,606 / $4,595
> / $9,040 / $208,371 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / B-24 / $115,338 / $32,659 / $4,220 / $49,781 / $3,205
> / $8,474 / $213,677 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / B-25 / $59,358 / $29,131 / $3,071 / $19,805 / $4,147 /
> $8,337 / $123,849 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / B-26 / $106,677 / $43,171 / $14,110 / $21,647 / $3,547
> / $7,749 / $196,901 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF /
> $1,250 / $188,257 / Costs based on final production contract
> 28-Feb-43 / A-20 / $44,366 / $30,795 / $4,428 / $18,364 / $2,345 /
> $3,813 / $104,111 / Costs based on final production contract
> 28-Feb-43 / A-26 / $106,807 / $33,466 / $3,700 / $29,277 / $14,067
> / $3,948 / $191,265 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / A-28 / $93,725 / $19,634 / $5,000 / $9,038 / $- /
> $250 / $127,647 / Costs based on final production contract
> 28-Feb-43 / A-29 / $91,688 / $23,000 / $5,000 / $9,038 / $2,093 /
> $250 / $131,069 / Costs based on final production contract
> 28-Feb-43 / A-30 / $103,962 / $29,104 / $4,668 / $3,712 / $2,737 /
> $6,777 / $150,960 / Costs based on final production contract
> 28-Feb-43 / A-24 / $33,172 / $9,103 / $1,739 / $1,997 / $1,640 /
> $4,800 / $52,451 / Costs based on final production contract
> 28-Feb-43 / A-25 / $67,492 / $13,559 / $3,988 / $1,997 / $2,240 /
> $3,500 / $92,776 / Costs based on final production contract
> 28-Feb-43 / A-31 / $67,230 / $13,859 / $2,330 / $1,863 / $1,978 /
> $250 / $87,510 / Costs based on final production contract
> 28-Feb-43 / A-35 / $36,874 / $13,351 / $2,353 / $3,026 / $2,270 /
> $3,911 / $61,785 / Costs based on final production contract
> 28-Feb-43 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 /
> $2,632 / $2,516 / $60,204 / Costs based on final production contract
> 28-Feb-43 / P-38 / $74,536 / $18,866 / $5,270 / $5,293 / $2,405 /
> $3,631 / $110,001 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-59 / $157,295 / $75,000 / $- / $2,001 / $4,034 /
> $2,864 / $241,194 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-61 / $154,899 / $44,714 / $6,352 / $14,507 / $4,684
> / $19,758 / $244,914 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 /
> $3,260 / $143,076 / Costs based on final production contract
> 28-Feb-43 / P-82 / $86,540 / $36,000 / $7,471 / $3,967 / $1,870 /
> $1,545 / $137,393 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-39 / $24,866 / $12,545 / $3,256 / $2,673 / $4,712 /
> $2,633 / $50,685 / Costs based on final production contract
> 28-Feb-43 / P-40 / $26,709 / $7,714 / $2,635 / $2,068 / $2,646 /
> $2,904 / $44,676 / Costs based on final production contract
> 28-Feb-43 / P-43 / $54,907 / $12,635 / $4,500 / $5,231 / $2,490 /
> $3,160 / $82,923 / Costs based on final production contract
> 28-Feb-43 / P-47 / $47,796 / $22,608 / $5,975 / $5,651 / $2,527 /
> $3,295 / $87,852 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-51 / $23,583 / $17,558 / $3,740 / $2,649 / $1,905 /
> $2,780 / $52,215 / Merlin Versions. Costs based on weighted average of
> uncompleted contracts
> 28-Feb-43 / P-63 / $28,049 / $13,183 / $3,540 / $3,693 / $4,296 /
> $2,640 / $55,401 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-66 / $70,503 / $17,509 / CF / CF / No info. /
> $3,160 / $91,172 / Costs based on final production contract
> 28-Feb-43 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 /
> $3,688 / $134,208 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-80 / $75,913 / $30,000 / $- / $2,944 / $1,897 /
> $2,317 / $113,071 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 /
> $1,341 / $3,260 / $162,993 / Costs based on weighted average of
> uncompleted contracts
> 28-Feb-43 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 /
> $10,500 / $603,932 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / OA-10 (PBY) / $216,250 / CF / CF / $559 / $- / CF /
> $216,809 / Costs based on weighted average of uncompleted contracts
> 28-Feb-43 / OA-11 / $175,000 / CF / CF / CF / $- / $- /
> $175,000 / Costs based on final production contract
> 28-Feb-43 / OA-12 (J2F) / $69,000 / CF / CF / CF / $- / $- /
> $69,000 / Costs based on final production contract
> 28-Feb-43 / TO-50 / $48,431 / CF / $250 / $919 / $26 / $1,200 /
> $50,826 / Costs based on final production contract
> 28-Feb-43 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 /
> $4,930 / $42,540 / Costs based on final production contract
> 28-Feb-43 / C-54 / $243,277 / $50,186 / $5,200 / $10,888 / $113 /
> $7,995 / $317,659 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-69 / $488,477 / $95,643 / $6,360 / $10,788 / $15 /
> $7,067 / $608,350 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-74 / $949,485 / $220,000 / $12,200 / $19,698 / $15 /
> $6,761 / $1,208,159 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-87 / $161,800 / $35,933 / $9,840 / $21,111 / $484 /
> $6,935 / $236,103 / Costs based on final production contract
> 28-Feb-43 / C-45 / $34,963 / $8,917 / $1,892 / $4,027 / No info. /
> $3,670 / $53,469 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-46 / $174,660 / $28,080 / $9,630 / $8,600 / $13 /
> $9,277 / $230,260 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-47 / $49,719 / $13,650 / $2,640 / $8,029 / $14 /
> $14,575 / $88,627 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-48 / $91,000 / $30,000 / $4,594 / $413 / $30 /
> $8,460 / $134,497 / Costs based on final production contract
> 28-Feb-43 / C-49 / $136,997 / CF / CF / $1,844 / $15 / $8,811 /
> $147,667 / Costs based on final production contract
> 28-Feb-43 / C-50 / $95,381 / $19,104 / $4,594 / $725 / No info. /
> $7,849 / $127,653 / Costs based on final production contract
> 28-Feb-43 / C-51 / $100,689 / $18,324 / $4,594 / $725 / No info. /
> $7,849 / $132,181 / Costs based on final production contract
> 28-Feb-43 / C-52 / $105,973 / $24,780 / $4,594 / $725 / No info. /
> $7,849 / $143,921 / Costs based on final production contract
> 28-Feb-43 / C-53 / $142,231 / CF / CF / $1,844 / $15 / $6,380 /
> $150,470 / Costs based on final production contract
> 28-Feb-43 / C-55 / $353,707 / CF / CF / CF / No info. / $7,849 /
> $361,556 / Costs based on final production contract
> 28-Feb-43 / C-56 / $108,797 / CF / CF / CF / No info. / No info. /
> $108,797 / Costs based on final production contract
> 28-Feb-43 / C-57 / $112,377 / CF / CF / CF / No info. / No info. /
> $112,377 / Costs based on final production contract
> 28-Feb-43 / C-59 / $92,833 / $17,000 / CF / CF / $- / $250 /
> $110,083 / Costs based on final production contract
> 28-Feb-43 / C-60 / $79,644 / $18,057 / $4,472 / $4,038 / $15 /
> $6,942 / $113,168 / Costs based on final production contract
> 28-Feb-43 / C-68 / $139,966 / CF / CF / CF / No info. / $7,849 /
> $147,815 / Costs based on final production contract
> 28-Feb-43 / C-76 / $137,125 / $14,690 / $5,950 / $9,280 / $15 /
> $7,100 / $174,160 / Costs based on final production contract
> 28-Feb-43 / C-78 / $16,873 / $5,852 / $1,988 / $2,657 / $15 /
> $6,348 / $33,733 / Costs based on final production contract
> 28-Feb-43 / C-82 / $427,244 / $36,000 / $3,880 / $8,592 / $15 /
> $6,415 / $482,146 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-43 / $18,732 / $5,074 / $1,104 / $1,162 / $- /
> $1,260 / $27,332 / Costs based on final production contract
> 28-Feb-43 / C-61 / $9,464 / $4,093 / CF / $207 / $- / $2,209 /
> $15,973 / Costs based on final production contract
> 28-Feb-43 / C-64 / $24,839 / $5,869 / $855 / $2,134 / $10 /
> $1,544 / $35,251 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / AT-7 / $41,719 / $14,519 / $2,050 / $8,250 / $- /
> $3,671 / $70,209 / Costs based on final production contract
> 28-Feb-43 / AT-8 / $25,646 / $7,438 / $1,932 / $5,455 / $- /
> $1,230 / $41,701 / Costs based on final production contract
> 28-Feb-43 / AT-9 / $27,603 / $6,947 / $1,700 / $7,042 / $- /
> $1,100 / $44,392 / Costs based on final production contract
> 28-Feb-43 / AT-10 / $29,600 / $7,534 / $1,665 / $5,271 / $- /
> $925 / $44,995 / Costs based on final production contract
> 28-Feb-43 / AT-11 / $36,447 / $14,519 / $1,965 / $8,250 / $650 /
> $2,636 / $64,467 / Costs based on final production contract
> 28-Feb-43 / AT-17 / $17,383 / $5,852 / $354 / $2,781 / $- /
> $1,100 / $27,470 / Costs based on final production contract
> 28-Feb-43 / AT-18 / $82,309 / $18,339 / $4,600 / $7,863 / $1,025 /
> $6,586 / $120,722 / Costs based on final production contract
> 28-Feb-43 / AT-20 / $44,737 / CF / CF / CF / $- / No info. /
> $44,737 / Costs based on final production contract
> 28-Feb-43 / AT-21 / $60,715 / $24,292 / $1,740 / $8,473 / $1,025 /
> $2,829 / $99,074 / Costs based on final production contract
> 28-Feb-43 / AT-6 / $11,500 / $5,869 / $853 / $2,409 / $270 /
> $1,318 / $22,219 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / AT-16 / $18,594 / $5,880 / $1,068 / $1,874 / $- / CF
> / $27,416 / Costs based on final production contract
> 28-Feb-43 / AT-19 / $17,736 / $3,470 / $850 / $440 / $- / No
> info. / $22,496 / Costs based on final production contract
> 28-Feb-43 / BT-12 / $29,159 / $8,558 / $900 / $2,335 / $- /
> $1,385 / $42,337 / Costs based on final production contract
> 28-Feb-43 / BT-13 / $7,076 / $7,260 / $900 / $2,360 / $- / $1,352
> / $18,948 / Costs based on final production contract
> 28-Feb-43 / BT-15 / $13,778 / $5,542 / $900 / $2,313 / $- /
> $1,356 / $23,889 / Costs based on final production contract
> 28-Feb-43 / PT-13 / $6,045 / $4,227 / $645 / $1,374 / $- / $- /
> $12,291 / Costs based on weighted average of uncompleted contracts
> 28-Feb-43 / PT-17 / $5,530 / $2,350 / $357 / $602 / $- / $97 /
> $8,936 / Costs based on final production contract
> 28-Feb-43 / PT-18 / $5,943 / $2,400 / $377 / $1,099 / $- / $- /
> $9,819 / Costs based on final production contract
> 28-Feb-43 / PT-19 / $8,107 / $3,317 / $150 / $429 / $- / $97 /
> $12,100 / Costs based on final production contract
> 28-Feb-43 / PT-22 / $8,226 / CF / CF / $247 / $- / $- / $8,473 /
> Costs based on final production contract
> 28-Feb-43 / PT-23 / $11,059 / $3,316 / $215 / $755 / $- / $97 /
> $15,442 / Costs based on final production contract
> 28-Feb-43 / PT-24 / $5,133 / Brit. Fr. / CF / CF / $- / $83 / $5,216
> / Costs based on final production contract
> 28-Feb-43 / PT-26 / $10,285 / $3,187 / $150 / $1,347 / $- / $83
> / $15,052 / Costs based on final production contract
> 28-Feb-43 / PT-27 / $5,341 / $2,678 / CF / CF / $- / $83 /
> $8,102 / Costs based on final production contract
> 28-Feb-43 / L-1 / $20,368 / $3,860 / $1,125 / $1,191 / $26 /
> $1,200 / $27,770 / Costs based on final production contract
> 28-Feb-43 / L-2 / $2,667 / CF / CF / $84 / $- / $247 / $2,998
> / Costs based on final production contract
> 28-Feb-43 / L-3 / $2,138 / CF / CF / $11 / $- / $247 / $2,396
> / Costs based on final production contract
> 28-Feb-43 / L-4 / $2,227 / CF / CF / $152 / $- / $247 / $2,626
> / Costs based on final production contract
> 28-Feb-43 / L-5 / $6,164 / $1,956 / $352 / $427 / $10 / $263 /
> $9,172 / Costs based on weighted average of uncompleted contracts
> 28-Feb-43 / L-6 / $6,054 / CF / CF / $11 / $- / $61 / $6,126 /
> Total in table minus Comms cost. Costs based on final production contract
> 28-Feb-43 / R-4 / $39,317 / $3,401 / $- / $667 / $- / $229 /
> $43,614 / Costs based on weighted average of uncompleted contracts
> 28-Feb-43 / R-5 / $50,600 / $7,259 / $- / $1,208 / $10 / $1,460
> / $60,537 / Costs based on weighted average of uncompleted contracts
> 28-Feb-43 / R-6 / $41,222 / $4,663 / $- / $1,153 / $10 / $1,152
> / $48,200 / Costs based on weighted average of uncompleted contracts
> 30-Nov-44 / B-29 / $434,512 / $101,877 / $13,628 / $124,787 /
> $5,531 / $34,738 / $715,073 / Costs based on uncompleted contracts
> 30-Nov-44 / B-32 / $522,816 / $101,877 / $24,892 / $71,208 / $4,624
> / $34,150 / $759,567 / Costs based on uncompleted contracts
> 30-Nov-44 / B-17 / $125,464 / $34,875 / $6,487 / $46,413 / $5,686
> / $9,040 / $227,965 / Costs based on uncompleted contracts
> 30-Nov-44 / B-24 / $114,951 / $34,497 / $8,663 / $48,288 / $4,505
> / $8,474 / $219,378 / Costs based on uncompleted contracts
> 30-Nov-44 / B-25 / $89,920 / $29,131 / $3,071 / $19,703 / $5,837 /
> $8,337 / $155,999 / Costs based on uncompleted contracts
> 30-Nov-44 / B-26 / $110,260 / $43,171 / $14,110 / $21,647 / $5,028
> / $7,749 / $201,965 / Costs based on uncompleted contracts
> 30-Nov-44 / A-26 / $116,760 / $34,194 / $3,034 / $29,488 / $13,213
> / $3,939 / $200,628 / Costs based on uncompleted contracts
> 30-Nov-44 / P-38 / $74,673 / $18,867 / $5,270 / $6,199 / $2,901 /
> $3,631 / $111,541 / Costs based on uncompleted contracts
> 30-Nov-44 / P-59 / $129,296 / $75,000 / $- / $2,001 / $4,034 /
> $2,864 / $213,195 / Costs based on uncompleted contracts
> 30-Nov-44 / P-61 / $147,960 / $44,729 / $9,720 / $17,611 / $6,245
> / $19,758 / $246,023 / Costs based on uncompleted contracts
> 30-Nov-44 / P-82 / $86,540 / $36,000 / $9,200 / $3,229 / $444 /
> $1,545 / $136,958 / Costs based on uncompleted contracts
> 30-Nov-44 / P-47 / $49,420 / $22,608 / $5,257 / $5,210 / $3,506 /
> $3,295 / $89,296 / Costs based on uncompleted contracts
> 30-Nov-44 / P-51 / $25,795 / $17,558 / $2,555 / $2,234 / $2,559 /
> $2,780 / $53,481 / Costs based on uncompleted contracts
> 30-Nov-44 / P-63 / $29,194 / $13,183 / $3,282 / $3,373 / $5,140 /
> $2,638 / $56,810 / Costs based on uncompleted contracts
> 30-Nov-44 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 /
> $3,688 / $134,208 / Costs based on uncompleted contracts
> 30-Nov-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 /
> $3,500 / $120,012 / Costs based on uncompleted contracts
> 30-Nov-44 / YP-60 / $1,293,710 / $24,868 / $6,881 / $2,722 / $1,784
> / $4,673 / $1,334,638 / Costs based on uncompleted contracts
> 30-Nov-44 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 /
> $10,500 / $603,932 / Costs based on uncompleted contracts
> 30-Nov-44 / OA-10 (PBY) / $216,058 / CF / CF / $559 / $- / CF /
> $216,617 / Costs based on uncompleted contracts
> 30-Nov-44 / C-54 / $256,186 / $58,094 / $6,287 / $9,949 / $15 /
> $7,637 / $338,168 / Costs based on uncompleted contracts
> 30-Nov-44 / C-69 / $534,707 / $95,678 / $6,360 / $7,736 / $15 /
> $7,067 / $651,563 / Costs based on uncompleted contracts
> 30-Nov-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 /
> $6,761 / $1,088,451 / Costs based on uncompleted contracts
> 30-Nov-44 / C-45 / $36,585 / $10,705 / $2,050 / $4,894 / $- /
> $3,671 / $57,905 / Costs based on uncompleted contracts
> 30-Nov-44 / C-46 / $174,696 / $31,748 / $12,244 / $8,785 / $15 /
> $9,277 / $236,765 / Costs based on uncompleted contracts
> 30-Nov-44 / C-47 / $53,490 / $13,733 / $3,028 / $7,805 / $15 /
> $15,220 / $93,291 / Costs based on uncompleted contracts
> 30-Nov-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 /
> $6,415 / $477,507 / Costs based on uncompleted contracts
> 30-Nov-44 / C-64 / $24,839 / $5,933 / $1,055 / $2,056 / $14 /
> $1,544 / $35,441 / Costs based on uncompleted contracts
> 30-Nov-44 / AT-6 / $13,100 / $5,933 / $1,050 / $2,501 / $700 /
> $1,318 / $24,602 / Costs based on uncompleted contracts
> 30-Nov-44 / L-4 / $2,210 / CF / CF / $150 / $- / $247 / $2,607 /
> Costs based on uncompleted contracts
> 30-Nov-44 / L-5 / $6,199 / $1,956 / $149 / $445 / $27 / $263 /
> $9,039 / Costs based on uncompleted contracts
> 30-Nov-44 / R-4 / $39,152 / $3,401 / $- / $667 / $- / $229 /
> $43,449 / Costs based on uncompleted contracts
> 30-Nov-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
> / $60,471 / Costs based on uncompleted contracts
> 30-Nov-44 / R-6 / $41,145 / $4,663 / $- / $1,019 / $14 / $1,152
> / $47,993 / Costs based on uncompleted contracts
> 31-Aug-44 / B-29 / $469,269 / $100,406 / $12,433 / $125,863 /
> $5,526 / $34,738 / $748,235 / Airframe and engine costs subject to
> revision. Costs based on uncompleted contracts
> 31-Aug-44 / B-32 / $522,661 / $100,406 / $20,841 / $66,491 / $4,624
> / $34,150 / $749,173 / Costs based on uncompleted contracts
> 31-Aug-44 / B-17 / $129,150 / $35,521 / $11,247 / $47,425 / $5,966
> / $9,040 / $238,349 / Costs based on uncompleted contracts
> 31-Aug-44 / B-24 / $138,585 / $33,363 / $13,004 / $47,956 / $4,520
> / $8,474 / $245,902 / Costs based on uncompleted contracts
> 31-Aug-44 / B-25 / $94,229 / $29,104 / $5,096 / $15,392 / $10,827
> / $8,337 / $162,985 / Costs based on uncompleted contracts
> 31-Aug-44 / B-26 / $120,048 / $43,171 / $14,145 / $20,169 / $5,296
> / $7,749 / $210,578 / Costs based on uncompleted contracts
> 31-Aug-44 / A-20 / $61,510 / $29,945 / $4,388 / $14,155 / $3,204 /
> $3,813 / $117,015 / Costs based on uncompleted contracts
> 31-Aug-44 / A-26 / $112,214 / $33,838 / $5,096 / $29,487 / $13,213
> / $3,939 / $197,787 / Costs based on uncompleted contracts
> 31-Aug-44 / P-38 / $70,168 / $19,344 / $5,386 / $6,383 / $2,914 /
> $3,631 / $107,826 / Costs based on uncompleted contracts
> 31-Aug-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 /
> $2,864 / $212,978 / Costs based on uncompleted contracts
> 31-Aug-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 /
> $1,545 / $132,358 / Costs based on uncompleted contracts
> 31-Aug-44 / P-39 / $26,471 / $12,545 / $3,750 / $2,673 / $4,712 /
> $2,633 / $52,784 / Costs based on uncompleted contracts
> 31-Aug-44 / P-40 / $26,352 / $10,503 / $3,110 / $2,068 / $2,646 /
> $2,904 / $47,583 / Costs based on uncompleted contracts
> 31-Aug-44 / P-47 / $55,783 / $23,852 / $6,960 / $5,357 / $3,506 /
> $2,948 / $98,406 / Costs based on uncompleted contracts
> 31-Aug-44 / P-51 / $27,889 / $17,545 / $4,391 / $2,236 / $2,574 /
> $2,780 / $57,415 / Costs based on uncompleted contracts
> 31-Aug-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 /
> $2,836 / $179,512 / Costs based on uncompleted contracts
> 31-Aug-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 /
> $3,688 / $135,398 / Costs based on uncompleted contracts
> 31-Aug-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 /
> $3,500 / $120,012 / Costs based on uncompleted contracts
> 31-Aug-44 / F-11 / $447,620 / $55,000 / $25,000 / $10,647 / $15 /
> $10,500 / $548,782 / Costs based on uncompleted contracts
> 31-Aug-44 / OA-10 (PBY) / $216,250 / CF / CF / CF / $- / CF / $216,250
> / Costs based on uncompleted contracts
> 31-Aug-44 / C-54 / $250,515 / $59,398 / $8,729 / $9,762 / $15 /
> $7,918 / $336,337 / Costs based on uncompleted contracts
> 31-Aug-44 / C-69 / $534,367 / $92,892 / $14,073 / $7,736 / $15 /
> $7,067 / $656,150 / Costs based on uncompleted contracts
> 31-Aug-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 /
> $6,761 / $1,088,451 / Costs based on uncompleted contracts
> 31-Aug-44 / C-87 / $155,000 / $28,334 / $9,840 / $22,811 / $15 /
> $6,935 / $222,935 / Costs based on uncompleted contracts
> 31-Aug-44 / C-45 / $38,764 / $14,519 / $4,100 / $5,292 / $- /
> $3,670 / $66,345 / Costs based on uncompleted contracts
> 31-Aug-44 / C-46 / $189,865 / $31,748 / $13,966 / $9,814 / $15 /
> $9,277 / $254,685 / Costs based on uncompleted contracts
> 31-Aug-44 / C-47 / $61,062 / $18,707 / $3,804 / $8,160 / $15 /
> $14,574 / $106,322 / Costs based on uncompleted contracts
> 31-Aug-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 /
> $6,415 / $477,507 / Costs based on uncompleted contracts
> 31-Aug-44 / UC-61 / $9,394 / $3,187 / $150 / $207 / $- / $2,209
> / $15,147 / Costs based on uncompleted contracts
> 31-Aug-44 / C-64 / $26,521 / $5,769 / $1,062 / $2,056 / $14 /
> $1,544 / $36,966 / Costs based on uncompleted contracts
> 31-Aug-44 / AT-7 / $41,275 / $10,286 / $2,050 / $8,250 / $- /
> $2,299 / $64,160 / Costs based on uncompleted contracts
> 31-Aug-44 / AT-21 / $62,389 / $24,292 / $1,844 / $8,457 / $1,025 /
> $2,758 / $100,765 / Costs based on uncompleted contracts
> 31-Aug-44 / AT-6 / $12,970 / $6,122 / $1,068 / $2,986 / $676 /
> $1,318 / $25,140 / Costs based on uncompleted contracts
> 31-Aug-44 / AT-19 / $17,736 / $3,805 / $905 / $440 / $- / No info.
> / $22,886 / Costs based on uncompleted contracts
> 31-Aug-44 / L-4 / $2,277 / CF / CF / $150 / $- / $247 / $2,674 /
> Costs based on uncompleted contracts
> 31-Aug-44 / L-5 / $6,359 / $1,956 / $149 / $463 / $26 / $263 /
> $9,216 / Costs based on uncompleted contracts
> 31-Aug-44 / R-4 / $39,152 / $3,406 / $- / $667 / $- / $229 /
> $43,454 / Costs based on uncompleted contracts
> 31-Aug-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
> / $60,471 / Costs based on uncompleted contracts
> 31-Aug-44 / R-6 / $41,142 / $4,663 / $- / $1,019 / $14 / $1,152
> / $47,990 / Costs based on uncompleted contracts
> 31-Aug-44 / CG-4A / $21,317 / $- / $- / $1,123 / $- / $155 /
> $22,595 / 15 place. Costs based on uncompleted contracts
> 31-Jul-44 / B-29 / $478,180 / $100,406 / $12,181 / $125,919 /
> $5,525 / $34,738 / $756,949 / Costs are weighted average of all Army
> contracts from 1939 to date
> 31-Jul-44 / B-32 / $540,305 / $100,406 / $18,000 / $68,734 / $4,624
> / $34,150 / $766,219 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / B-17 / $157,484 / $37,480 / $11,755 / $48,939 / $5,999
> / $10,305 / $271,962 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / B-24 / $169,452 / $36,539 / $12,899 / $49,034 / $4,726
> / $9,752 / $282,402 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / B-25 / $93,690 / $29,589 / $5,201 / $20,514 / $8,041 /
> $8,899 / $165,934 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / B-26 / $140,735 / $48,097 / $13,999 / $22,041 / $5,059
> / $12,590 / $242,521 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF /
> $1,250 / $188,257 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-20 / $75,448 / $26,333 / $5,020 / $9,920 / $3,768 /
> $3,828 / $124,317 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-26 / $112,264 / $33,838 / $5,096 / $29,488 / $13,213
> / $3,939 / $197,838 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / A-28 / $91,499 / $19,634 / $5,000 / $9,038 / $- /
> $250 / $125,421 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-29 / $89,262 / $21,653 / $5,000 / $9,038 / $2,093 /
> $250 / $127,296 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-30 / $110,586 / $28,427 / $4,664 / $3,250 / $2,773 /
> $3,583 / $153,283 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-24 / $35,922 / $8,971 / $1,739 / $2,876 / $1,720 /
> $5,197 / $56,425 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-25 / $67,492 / $14,001 / $3,988 / $6,692 / $2,303 /
> $3,818 / $98,294 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-31 / $65,852 / $17,990 / $2,330 / $1,863 / $1,978 /
> $250 / $90,263 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-35 / $56,166 / $14,552 / $2,353 / $3,026 / $2,270 /
> $3,911 / $82,278 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 /
> $2,632 / $2,516 / $60,204 / Costs are weighted average of all Army
> contracts from 1939 to date
> 31-Jul-44 / P-38 / $73,607 / $21,096 / $5,822 / $7,748 / $3,531 /
> $3,873 / $115,677 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 /
> $2,864 / $212,978 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-61 / $191,831 / $49,392 / $11,841 / $18,144 / $6,308
> / $19,918 / $297,434 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 /
> $3,260 / $143,076 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 /
> $1,545 / $132,358 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-39 / $32,824 / $13,518 / $4,972 / $2,907 / $5,767 /
> $4,305 / $64,293 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-40 / $29,515 / $13,905 / $3,266 / $2,325 / $3,237 /
> $3,720 / $55,968 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-47 / $61,699 / $24,313 / $6,922 / $5,767 / $3,504 /
> $3,303 / $105,508 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-51 / $28,984 / $17,328 / $4,887 / $2,322 / $2,493 /
> $2,830 / $58,844 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-63 / $28,551 / $13,944 / $5,238 / $2,984 / $4,969 /
> $2,636 / $58,322 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 /
> $2,836 / $179,512 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 /
> $3,688 / $135,398 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 /
> $1,341 / $3,260 / $162,993 / Costs are weighted average of all Army
> contracts from 1939 to date
> 31-Jul-44 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 /
> $4,930 / $42,540 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / OA-10 (PBY) / $158,941 / $25,269 / in GFE / $24,975 /
> $3,174 / $10,440 / $222,799 / Costs are weighted average of all Army
> contracts from 1939 to date
> 31-Jul-44 / C-54 / $262,501 / $59,639 / $9,468 / $9,804 / $15 /
> $7,824 / $349,251 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-69 / $534,331 / $92,892 / $15,120 / $7,736 / $15 /
> $7,067 / $657,161 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 /
> $6,761 / $1,088,451 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / C-87 / $196,474 / $31,517 / $9,840 / $22,099 / $211 /
> $6,935 / $267,076 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-46 / $197,639 / $33,772 / $13,821 / $9,981 / $15 /
> $9,315 / $264,543 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-47 / $73,749 / $17,428 / $4,616 / $5,707 / $16 /
> $16,508 / $118,024 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / C-48 / $91,229 / $30,000 / $4,594 / $413 / $30 /
> $8,460 / $134,726 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-49 / $104,870 / $25,269 / $4,594 / $1,854 / $15 /
> $8,559 / $145,161 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-50 / $97,273 / $23,067 / $4,594 / $725 / No info. /
> $7,849 / $133,508 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-51 / $100,689 / $18,324 / $4,594 / $725 / No info. /
> $7,849 / $132,181 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-52 / $105,052 / $24,780 / $4,594 / $725 / No info. /
> $7,849 / $143,000 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-53 / $107,124 / $22,431 / $4,627 / $3,096 / $26 /
> $7,392 / $144,696 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-55 / $353,707 / CF / CF / CF / No info. / $7,849 /
> $361,556 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-56 / $106,681 / CF / CF / CF / No info. / $7,849 /
> $114,530 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-57 / $103,314 / CF / CF / CF / No info. / $8,136 /
> $111,450 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-59 / $92,833 / $17,000 / CF / CF / $- / $250 /
> $110,083 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-60 / $91,978 / $18,264 / $4,076 / $2,805 / $15 /
> $5,396 / $122,534 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-68 / $139,966 / CF / CF / CF / No info. / $7,849 /
> $147,815 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-76 / $135,489 / $14,690 / $5,950 / $9,280 / $15 /
> $7,100 / $172,524 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 /
> $6,415 / $477,507 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-45 / $39,667 / $14,478 / $3,231 / $5,257 / $30 /
> $3,655 / $66,318 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-78 / $16,818 / $5,919 / $1,988 / $2,709 / $15 /
> $6,348 / $33,797 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-43 / $18,687 / $6,000 / $1,104 / $896 / $- / $- /
> $26,687 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-61 / $7,611 / $3,419 / $150 / $258 / $- / $2,209 /
> $13,647 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-64 / $26,336 / $5,892 / $1,062 / $2,052 / $15 /
> $1,544 / $36,901 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-7 / $43,504 / $11,767 / $2,096 / $7,823 / $- /
> $2,850 / $68,040 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-8 / $25,646 / $7,438 / $1,932 / $5,455 / $- /
> $1,230 / $41,701 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-9 / $27,927 / $7,134 / $1,777 / $6,602 / $- /
> $1,143 / $44,583 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-10 / $26,886 / $7,702 / $1,957 / $5,577 / $- /
> $1,543 / $43,665 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-11 / $47,429 / $10,819 / $2,098 / $17,601 / $688 /
> $1,541 / $80,176 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-17 / $20,968 / $6,530 / $361 / $3,247 / $- /
> $1,432 / $32,538 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-18 / $83,890 / $18,666 / $4,600 / $6,279 / $987 /
> $6,586 / $121,008 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-20 / $44,737 / CF / CF / CF / $- / No info. / $44,737 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / AT-21 / $62,381 / $24,292 / $1,844 / $8,458 / $1,025 /
> $2,756 / $100,756 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-6 / $14,188 / $6,187 / $1,068 / $3,107 / $706 /
> $1,595 / $26,851 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-16 / $18,565 / $6,262 / $1,192 / $1,476 / $- / CF /
> $27,495 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / AT-19 / $22,793 / $5,338 / $1,320 / $3,041 / $- /
> $1,230 / $33,722 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / BT-12 / $29,159 / $8,558 / $900 / $2,335 / $- /
> $1,385 / $42,337 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / BT-13 / $12,657 / $6,838 / $901 / $2,630 / $- /
> $1,363 / $24,389 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / BT-15 / $13,741 / $5,504 / $903 / $2,430 / $- /
> $1,350 / $23,928 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / PT-13 / $6,054 / $3,178 / $553 / $1,180 / $- / $- /
> $10,965 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / PT-17 / $5,756 / $2,393 / $373 / $829 / $- / $96 /
> $9,447 / Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / PT-18 / $5,943 / $2,400 / $377 / $1,099 / $- / $- /
> $9,819 / Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / PT-19 / $7,340 / $3,316 / $150 / $440 / $- / $97 /
> $11,343 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / PT-22 / $8,729 / CF / CF / $240 / $- / $- / $8,969 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / PT-23 / $10,632 / $3,231 / $187 / $870 / $- / $97 /
> $15,017 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / PT-24 / $5,133 / Brit. Fr. / CF / CF / $- / $83 / $5,216
> / Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / PT-26 / $9,668 / $3,192 / $150 / $1,289 / $- / $91 /
> $14,390 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / PT-27 / $5,341 / 2678 / CF / CF / $- / $83 / $8,102 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / L-1 / $18,341 / $3,647 / $1,031 / $1,175 / $26 /
> $1,200 / $25,420 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / L-2 / $2,615 / CF / CF / $60 / $- / $247 / $2,922 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / L-3 / $2,188 / CF / CF / $49 / $- / $247 / $2,484 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / L-4 / $2,140 / CF / CF / $114 / $- / $247 / $2,501 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / L-5 / $6,763 / $1,958 / $149 / $454 / $20 / $262 /
> $9,606 / Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / L-6 / $6,070 / CF / CF / $11 / $- / No info. / $6,081 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / R-4 / $46,826 / $3,406 / $- / $689 / $- / $229 /
> $51,150 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
> / $60,471 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / R-6 / $41,142 / $4,663 / $- / $1,019 / $14 / $1,152
> / $47,990 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jan-44 / YCG-13 / $54,792 / $- / $- / $1,683 / $- / $- /
> $56,475 / 30 place. Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jan-44 / CG-4A / $23,693 / $- / $- / $1,123 / $- / $- /
> $24,816 / 15 place, table total is 24,734. Costs are weighted average of
> all Army contracts from 1939 to date
> 31-Jan-44 / CG-3A / $24,835 / $- / $- / $885 / $- / $- /
> $25,720 / 9 Place. Costs are weighted average of all Army contracts from
> 1939 to date

Weapon costs are going up over time despite greater production, not sure
whether its inflation or improvements in design mainly.

SubjectRepliesAuthor
o WWII Weapons cost, mostly aircraft.

By: Geoffrey Sinclair on Sat, 9 Oct 2021

2Geoffrey Sinclair
server_pubkey.txt

rocksolid light 0.9.81
clearnet tor