Rocksolid Light

Welcome to novaBBS (click a section below)

mail  files  register  newsreader  groups  login

Message-ID:  

What this country needs is a good five cent microcomputer.


tech / rec.aviation.military / Re: WWII Weapons cost, mostly aircraft.

SubjectAuthor
* WWII Weapons cost, mostly aircraft.Geoffrey Sinclair
`* Re: WWII Weapons cost, mostly aircraft.SolomonW
 `- Re: WWII Weapons cost, mostly aircraft.Keith Willshaw

1
WWII Weapons cost, mostly aircraft.

<sjs2hi$mvb$1@dont-email.me>

  copy mid

https://www.novabbs.com/tech/article-flat.php?id=2814&group=rec.aviation.military#2814

  copy link   Newsgroups: rec.aviation.military
Path: rocksolid2!i2pn.org!eternal-september.org!reader02.eternal-september.org!.POSTED!not-for-mail
From: gsinclai...@froggy.com.au (Geoffrey Sinclair)
Newsgroups: rec.aviation.military
Subject: WWII Weapons cost, mostly aircraft.
Date: Sat, 9 Oct 2021 23:38:10 +1100
Organization: A noiseless patient Spider
Lines: 1433
Message-ID: <sjs2hi$mvb$1@dont-email.me>
Mime-Version: 1.0
Content-Type: text/plain;
format=flowed;
charset="iso-8859-1";
reply-type=original
Content-Transfer-Encoding: 7bit
Injection-Date: Sat, 9 Oct 2021 12:39:16 -0000 (UTC)
Injection-Info: reader02.eternal-september.org; posting-host="10a388d16458f80a788ab7453982ef42";
logging-data="23531"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX18Wu78AvU7IueyK7zM9Xe3qAQv7NtSl7gM="
Cancel-Lock: sha1:tDG9ecweoLtfNhqh3xGnL8o7lfg=
X-MimeOLE: Produced By Microsoft MimeOLE V6.1.7601.24158
X-Antivirus-Status: Clean
X-Newsreader: Microsoft Windows Mail 6.0.6002.18197
X-Antivirus: AVG (VPS 211009-2, 10/9/2021), Outbound message
X-Priority: 3
X-MSMail-Priority: Normal
 by: Geoffrey Sinclair - Sat, 9 Oct 2021 12:38 UTC

What does an aircraft cost has the answer it depends. The following is a
collection of figures and show plenty of variation. Things like whether
spare parts are included, if a company is making more than one product how
things like head office costs are allocated, whether depreciation of the
building etc. is included.

In April 1938 the British calculated the total cost of ownership of a naval
aircraft, that is purchase, running and modernisation cost, as 11,500 pounds
per year, which meant it was about 6 aircraft to the destroyer.

Australian Archives MP450/1 109 Detailed break down of Beaufort costs, per
aircraft in Australian pounds.
Tooling 1,895, preliminary expenses 532, Improvements and extensions to
properties 893 (Railways 554, Holden 186, other contractors 10, stores,
flight field and plants 143), Plant, machinery and equipment 1,136, office
furniture 168, which gives a total of 4,623 of establishment costs per
aircraft.

Newport Workshop 1,477 (Labor 622, overhead 693, sub contract 162), Chullora
Workshop 2,019 (Labor 734, overhead 1,155, sub contract 130), Islington
Workshop 1,342 (Labor 516, overhead 745, sub contract 81),

Assembly Workshops Mascot/Fishermans Bend 2,510 (Labor 1,038, overhead
1,472), Holden production cost per aircraft set 2,321, Richards Industries
production cost per aircraft set 292, freight 350, central office overhead
3,224, Materials (including sub contractors' costs other than Holden or
Richards Industries) Holden 821 (746 plus 75 for ten percent allowance),
Richards Industries 44 (40 plus 4 for ten percent allowance), Newport (795
plus 79 for ten percent allowance), Chullora (2,780 plus 278 for ten percent
allowance), Islington 1,407 (1,279 plus 128 for ten percent allowance),
Assembly (4,446 plus 445 for ten percent allowance). Appendix A equipment
including gun turret 2,627 (Which gives the airframe cost as 27,257),
Engines and Propellers (Overseas costs, Wasp engines and Curtiss propellers)
12,546 (Which gives total aircraft cost of 39,803). So 39,803 plus 4,623
gives total costs per completed aircraft as 44,426 pounds. The above
excluding license fees.

Firstly some US data. Ford Willow run used more tooling and so less man
hours but costs about the same, for a variety of reasons including the
frequent design changes.

Aircraft Unit costs, US Archives RG18 E 10 B 68, CF Contractor Furnished,
GFE Government Furnished Equipment
Date / Model / Airframe / Engines(s) / Propeller(s) / GFE / Ordnance /
Communications / Total / Notes
28-Feb-43 / B-29 / $362,347 / $101,685 / $10,328 / $125,341 /
$4,836 / $34,738 / $639,275 / Costs based on weighted average of
uncompleted contracts
28-Feb-43 / B-32 / $522,613 / $101,685 / $23,310 / $68,947 / $3,247
/ $34,150 / $753,952 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / B-17 / $111,443 / $34,287 / $3,400 / $45,606 / $4,595
/ $9,040 / $208,371 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / B-24 / $115,338 / $32,659 / $4,220 / $49,781 / $3,205
/ $8,474 / $213,677 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / B-25 / $59,358 / $29,131 / $3,071 / $19,805 / $4,147 /
$8,337 / $123,849 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / B-26 / $106,677 / $43,171 / $14,110 / $21,647 / $3,547
/ $7,749 / $196,901 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF /
$1,250 / $188,257 / Costs based on final production contract
28-Feb-43 / A-20 / $44,366 / $30,795 / $4,428 / $18,364 / $2,345 /
$3,813 / $104,111 / Costs based on final production contract
28-Feb-43 / A-26 / $106,807 / $33,466 / $3,700 / $29,277 / $14,067
/ $3,948 / $191,265 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / A-28 / $93,725 / $19,634 / $5,000 / $9,038 / $- /
$250 / $127,647 / Costs based on final production contract
28-Feb-43 / A-29 / $91,688 / $23,000 / $5,000 / $9,038 / $2,093 /
$250 / $131,069 / Costs based on final production contract
28-Feb-43 / A-30 / $103,962 / $29,104 / $4,668 / $3,712 / $2,737 /
$6,777 / $150,960 / Costs based on final production contract
28-Feb-43 / A-24 / $33,172 / $9,103 / $1,739 / $1,997 / $1,640 /
$4,800 / $52,451 / Costs based on final production contract
28-Feb-43 / A-25 / $67,492 / $13,559 / $3,988 / $1,997 / $2,240 /
$3,500 / $92,776 / Costs based on final production contract
28-Feb-43 / A-31 / $67,230 / $13,859 / $2,330 / $1,863 / $1,978 /
$250 / $87,510 / Costs based on final production contract
28-Feb-43 / A-35 / $36,874 / $13,351 / $2,353 / $3,026 / $2,270 /
$3,911 / $61,785 / Costs based on final production contract
28-Feb-43 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 /
$2,632 / $2,516 / $60,204 / Costs based on final production contract
28-Feb-43 / P-38 / $74,536 / $18,866 / $5,270 / $5,293 / $2,405 /
$3,631 / $110,001 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-59 / $157,295 / $75,000 / $- / $2,001 / $4,034 /
$2,864 / $241,194 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-61 / $154,899 / $44,714 / $6,352 / $14,507 / $4,684
/ $19,758 / $244,914 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 /
$3,260 / $143,076 / Costs based on final production contract
28-Feb-43 / P-82 / $86,540 / $36,000 / $7,471 / $3,967 / $1,870 /
$1,545 / $137,393 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-39 / $24,866 / $12,545 / $3,256 / $2,673 / $4,712 /
$2,633 / $50,685 / Costs based on final production contract
28-Feb-43 / P-40 / $26,709 / $7,714 / $2,635 / $2,068 / $2,646 /
$2,904 / $44,676 / Costs based on final production contract
28-Feb-43 / P-43 / $54,907 / $12,635 / $4,500 / $5,231 / $2,490 /
$3,160 / $82,923 / Costs based on final production contract
28-Feb-43 / P-47 / $47,796 / $22,608 / $5,975 / $5,651 / $2,527 /
$3,295 / $87,852 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-51 / $23,583 / $17,558 / $3,740 / $2,649 / $1,905 /
$2,780 / $52,215 / Merlin Versions. Costs based on weighted average of
uncompleted contracts
28-Feb-43 / P-63 / $28,049 / $13,183 / $3,540 / $3,693 / $4,296 /
$2,640 / $55,401 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-66 / $70,503 / $17,509 / CF / CF / No info. /
$3,160 / $91,172 / Costs based on final production contract
28-Feb-43 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 /
$3,688 / $134,208 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / P-80 / $75,913 / $30,000 / $- / $2,944 / $1,897 /
$2,317 / $113,071 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 /
$1,341 / $3,260 / $162,993 / Costs based on weighted average of
uncompleted contracts
28-Feb-43 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 /
$10,500 / $603,932 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / OA-10 (PBY) / $216,250 / CF / CF / $559 / $- / CF /
$216,809 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / OA-11 / $175,000 / CF / CF / CF / $- / $- /
$175,000 / Costs based on final production contract
28-Feb-43 / OA-12 (J2F) / $69,000 / CF / CF / CF / $- / $- /
$69,000 / Costs based on final production contract
28-Feb-43 / TO-50 / $48,431 / CF / $250 / $919 / $26 / $1,200 /
$50,826 / Costs based on final production contract
28-Feb-43 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 /
$4,930 / $42,540 / Costs based on final production contract
28-Feb-43 / C-54 / $243,277 / $50,186 / $5,200 / $10,888 / $113 /
$7,995 / $317,659 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-69 / $488,477 / $95,643 / $6,360 / $10,788 / $15 /
$7,067 / $608,350 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-74 / $949,485 / $220,000 / $12,200 / $19,698 / $15 /
$6,761 / $1,208,159 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-87 / $161,800 / $35,933 / $9,840 / $21,111 / $484 /
$6,935 / $236,103 / Costs based on final production contract
28-Feb-43 / C-45 / $34,963 / $8,917 / $1,892 / $4,027 / No info. /
$3,670 / $53,469 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-46 / $174,660 / $28,080 / $9,630 / $8,600 / $13 /
$9,277 / $230,260 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-47 / $49,719 / $13,650 / $2,640 / $8,029 / $14 /
$14,575 / $88,627 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-48 / $91,000 / $30,000 / $4,594 / $413 / $30 /
$8,460 / $134,497 / Costs based on final production contract
28-Feb-43 / C-49 / $136,997 / CF / CF / $1,844 / $15 / $8,811 /
$147,667 / Costs based on final production contract
28-Feb-43 / C-50 / $95,381 / $19,104 / $4,594 / $725 / No info. /
$7,849 / $127,653 / Costs based on final production contract
28-Feb-43 / C-51 / $100,689 / $18,324 / $4,594 / $725 / No info. /
$7,849 / $132,181 / Costs based on final production contract
28-Feb-43 / C-52 / $105,973 / $24,780 / $4,594 / $725 / No info. /
$7,849 / $143,921 / Costs based on final production contract
28-Feb-43 / C-53 / $142,231 / CF / CF / $1,844 / $15 / $6,380 /
$150,470 / Costs based on final production contract
28-Feb-43 / C-55 / $353,707 / CF / CF / CF / No info. / $7,849 /
$361,556 / Costs based on final production contract
28-Feb-43 / C-56 / $108,797 / CF / CF / CF / No info. / No info. /
$108,797 / Costs based on final production contract
28-Feb-43 / C-57 / $112,377 / CF / CF / CF / No info. / No info. /
$112,377 / Costs based on final production contract
28-Feb-43 / C-59 / $92,833 / $17,000 / CF / CF / $- / $250 /
$110,083 / Costs based on final production contract
28-Feb-43 / C-60 / $79,644 / $18,057 / $4,472 / $4,038 / $15 /
$6,942 / $113,168 / Costs based on final production contract
28-Feb-43 / C-68 / $139,966 / CF / CF / CF / No info. / $7,849 /
$147,815 / Costs based on final production contract
28-Feb-43 / C-76 / $137,125 / $14,690 / $5,950 / $9,280 / $15 /
$7,100 / $174,160 / Costs based on final production contract
28-Feb-43 / C-78 / $16,873 / $5,852 / $1,988 / $2,657 / $15 /
$6,348 / $33,733 / Costs based on final production contract
28-Feb-43 / C-82 / $427,244 / $36,000 / $3,880 / $8,592 / $15 /
$6,415 / $482,146 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / C-43 / $18,732 / $5,074 / $1,104 / $1,162 / $- /
$1,260 / $27,332 / Costs based on final production contract
28-Feb-43 / C-61 / $9,464 / $4,093 / CF / $207 / $- / $2,209 /
$15,973 / Costs based on final production contract
28-Feb-43 / C-64 / $24,839 / $5,869 / $855 / $2,134 / $10 /
$1,544 / $35,251 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / AT-7 / $41,719 / $14,519 / $2,050 / $8,250 / $- /
$3,671 / $70,209 / Costs based on final production contract
28-Feb-43 / AT-8 / $25,646 / $7,438 / $1,932 / $5,455 / $- /
$1,230 / $41,701 / Costs based on final production contract
28-Feb-43 / AT-9 / $27,603 / $6,947 / $1,700 / $7,042 / $- /
$1,100 / $44,392 / Costs based on final production contract
28-Feb-43 / AT-10 / $29,600 / $7,534 / $1,665 / $5,271 / $- /
$925 / $44,995 / Costs based on final production contract
28-Feb-43 / AT-11 / $36,447 / $14,519 / $1,965 / $8,250 / $650 /
$2,636 / $64,467 / Costs based on final production contract
28-Feb-43 / AT-17 / $17,383 / $5,852 / $354 / $2,781 / $- /
$1,100 / $27,470 / Costs based on final production contract
28-Feb-43 / AT-18 / $82,309 / $18,339 / $4,600 / $7,863 / $1,025 /
$6,586 / $120,722 / Costs based on final production contract
28-Feb-43 / AT-20 / $44,737 / CF / CF / CF / $- / No info. /
$44,737 / Costs based on final production contract
28-Feb-43 / AT-21 / $60,715 / $24,292 / $1,740 / $8,473 / $1,025 /
$2,829 / $99,074 / Costs based on final production contract
28-Feb-43 / AT-6 / $11,500 / $5,869 / $853 / $2,409 / $270 /
$1,318 / $22,219 / Costs based on weighted average of uncompleted
contracts
28-Feb-43 / AT-16 / $18,594 / $5,880 / $1,068 / $1,874 / $- / CF
/ $27,416 / Costs based on final production contract
28-Feb-43 / AT-19 / $17,736 / $3,470 / $850 / $440 / $- / No
info. / $22,496 / Costs based on final production contract
28-Feb-43 / BT-12 / $29,159 / $8,558 / $900 / $2,335 / $- /
$1,385 / $42,337 / Costs based on final production contract
28-Feb-43 / BT-13 / $7,076 / $7,260 / $900 / $2,360 / $- / $1,352
/ $18,948 / Costs based on final production contract
28-Feb-43 / BT-15 / $13,778 / $5,542 / $900 / $2,313 / $- /
$1,356 / $23,889 / Costs based on final production contract
28-Feb-43 / PT-13 / $6,045 / $4,227 / $645 / $1,374 / $- / $- /
$12,291 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / PT-17 / $5,530 / $2,350 / $357 / $602 / $- / $97 /
$8,936 / Costs based on final production contract
28-Feb-43 / PT-18 / $5,943 / $2,400 / $377 / $1,099 / $- / $- /
$9,819 / Costs based on final production contract
28-Feb-43 / PT-19 / $8,107 / $3,317 / $150 / $429 / $- / $97 /
$12,100 / Costs based on final production contract
28-Feb-43 / PT-22 / $8,226 / CF / CF / $247 / $- / $- / $8,473 /
Costs based on final production contract
28-Feb-43 / PT-23 / $11,059 / $3,316 / $215 / $755 / $- / $97 /
$15,442 / Costs based on final production contract
28-Feb-43 / PT-24 / $5,133 / Brit. Fr. / CF / CF / $- / $83 / $5,216
/ Costs based on final production contract
28-Feb-43 / PT-26 / $10,285 / $3,187 / $150 / $1,347 / $- / $83
/ $15,052 / Costs based on final production contract
28-Feb-43 / PT-27 / $5,341 / $2,678 / CF / CF / $- / $83 /
$8,102 / Costs based on final production contract
28-Feb-43 / L-1 / $20,368 / $3,860 / $1,125 / $1,191 / $26 /
$1,200 / $27,770 / Costs based on final production contract
28-Feb-43 / L-2 / $2,667 / CF / CF / $84 / $- / $247 / $2,998
/ Costs based on final production contract
28-Feb-43 / L-3 / $2,138 / CF / CF / $11 / $- / $247 / $2,396
/ Costs based on final production contract
28-Feb-43 / L-4 / $2,227 / CF / CF / $152 / $- / $247 / $2,626
/ Costs based on final production contract
28-Feb-43 / L-5 / $6,164 / $1,956 / $352 / $427 / $10 / $263 /
$9,172 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / L-6 / $6,054 / CF / CF / $11 / $- / $61 / $6,126 /
Total in table minus Comms cost. Costs based on final production contract
28-Feb-43 / R-4 / $39,317 / $3,401 / $- / $667 / $- / $229 /
$43,614 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / R-5 / $50,600 / $7,259 / $- / $1,208 / $10 / $1,460
/ $60,537 / Costs based on weighted average of uncompleted contracts
28-Feb-43 / R-6 / $41,222 / $4,663 / $- / $1,153 / $10 / $1,152
/ $48,200 / Costs based on weighted average of uncompleted contracts
30-Nov-44 / B-29 / $434,512 / $101,877 / $13,628 / $124,787 /
$5,531 / $34,738 / $715,073 / Costs based on uncompleted contracts
30-Nov-44 / B-32 / $522,816 / $101,877 / $24,892 / $71,208 / $4,624
/ $34,150 / $759,567 / Costs based on uncompleted contracts
30-Nov-44 / B-17 / $125,464 / $34,875 / $6,487 / $46,413 / $5,686
/ $9,040 / $227,965 / Costs based on uncompleted contracts
30-Nov-44 / B-24 / $114,951 / $34,497 / $8,663 / $48,288 / $4,505
/ $8,474 / $219,378 / Costs based on uncompleted contracts
30-Nov-44 / B-25 / $89,920 / $29,131 / $3,071 / $19,703 / $5,837 /
$8,337 / $155,999 / Costs based on uncompleted contracts
30-Nov-44 / B-26 / $110,260 / $43,171 / $14,110 / $21,647 / $5,028
/ $7,749 / $201,965 / Costs based on uncompleted contracts
30-Nov-44 / A-26 / $116,760 / $34,194 / $3,034 / $29,488 / $13,213
/ $3,939 / $200,628 / Costs based on uncompleted contracts
30-Nov-44 / P-38 / $74,673 / $18,867 / $5,270 / $6,199 / $2,901 /
$3,631 / $111,541 / Costs based on uncompleted contracts
30-Nov-44 / P-59 / $129,296 / $75,000 / $- / $2,001 / $4,034 /
$2,864 / $213,195 / Costs based on uncompleted contracts
30-Nov-44 / P-61 / $147,960 / $44,729 / $9,720 / $17,611 / $6,245
/ $19,758 / $246,023 / Costs based on uncompleted contracts
30-Nov-44 / P-82 / $86,540 / $36,000 / $9,200 / $3,229 / $444 /
$1,545 / $136,958 / Costs based on uncompleted contracts
30-Nov-44 / P-47 / $49,420 / $22,608 / $5,257 / $5,210 / $3,506 /
$3,295 / $89,296 / Costs based on uncompleted contracts
30-Nov-44 / P-51 / $25,795 / $17,558 / $2,555 / $2,234 / $2,559 /
$2,780 / $53,481 / Costs based on uncompleted contracts
30-Nov-44 / P-63 / $29,194 / $13,183 / $3,282 / $3,373 / $5,140 /
$2,638 / $56,810 / Costs based on uncompleted contracts
30-Nov-44 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 /
$3,688 / $134,208 / Costs based on uncompleted contracts
30-Nov-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 /
$3,500 / $120,012 / Costs based on uncompleted contracts
30-Nov-44 / YP-60 / $1,293,710 / $24,868 / $6,881 / $2,722 / $1,784
/ $4,673 / $1,334,638 / Costs based on uncompleted contracts
30-Nov-44 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 /
$10,500 / $603,932 / Costs based on uncompleted contracts
30-Nov-44 / OA-10 (PBY) / $216,058 / CF / CF / $559 / $- / CF /
$216,617 / Costs based on uncompleted contracts
30-Nov-44 / C-54 / $256,186 / $58,094 / $6,287 / $9,949 / $15 /
$7,637 / $338,168 / Costs based on uncompleted contracts
30-Nov-44 / C-69 / $534,707 / $95,678 / $6,360 / $7,736 / $15 /
$7,067 / $651,563 / Costs based on uncompleted contracts
30-Nov-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 /
$6,761 / $1,088,451 / Costs based on uncompleted contracts
30-Nov-44 / C-45 / $36,585 / $10,705 / $2,050 / $4,894 / $- /
$3,671 / $57,905 / Costs based on uncompleted contracts
30-Nov-44 / C-46 / $174,696 / $31,748 / $12,244 / $8,785 / $15 /
$9,277 / $236,765 / Costs based on uncompleted contracts
30-Nov-44 / C-47 / $53,490 / $13,733 / $3,028 / $7,805 / $15 /
$15,220 / $93,291 / Costs based on uncompleted contracts
30-Nov-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 /
$6,415 / $477,507 / Costs based on uncompleted contracts
30-Nov-44 / C-64 / $24,839 / $5,933 / $1,055 / $2,056 / $14 /
$1,544 / $35,441 / Costs based on uncompleted contracts
30-Nov-44 / AT-6 / $13,100 / $5,933 / $1,050 / $2,501 / $700 /
$1,318 / $24,602 / Costs based on uncompleted contracts
30-Nov-44 / L-4 / $2,210 / CF / CF / $150 / $- / $247 / $2,607 /
Costs based on uncompleted contracts
30-Nov-44 / L-5 / $6,199 / $1,956 / $149 / $445 / $27 / $263 /
$9,039 / Costs based on uncompleted contracts
30-Nov-44 / R-4 / $39,152 / $3,401 / $- / $667 / $- / $229 /
$43,449 / Costs based on uncompleted contracts
30-Nov-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
/ $60,471 / Costs based on uncompleted contracts
30-Nov-44 / R-6 / $41,145 / $4,663 / $- / $1,019 / $14 / $1,152
/ $47,993 / Costs based on uncompleted contracts
31-Aug-44 / B-29 / $469,269 / $100,406 / $12,433 / $125,863 /
$5,526 / $34,738 / $748,235 / Airframe and engine costs subject to
revision. Costs based on uncompleted contracts
31-Aug-44 / B-32 / $522,661 / $100,406 / $20,841 / $66,491 / $4,624
/ $34,150 / $749,173 / Costs based on uncompleted contracts
31-Aug-44 / B-17 / $129,150 / $35,521 / $11,247 / $47,425 / $5,966
/ $9,040 / $238,349 / Costs based on uncompleted contracts
31-Aug-44 / B-24 / $138,585 / $33,363 / $13,004 / $47,956 / $4,520
/ $8,474 / $245,902 / Costs based on uncompleted contracts
31-Aug-44 / B-25 / $94,229 / $29,104 / $5,096 / $15,392 / $10,827
/ $8,337 / $162,985 / Costs based on uncompleted contracts
31-Aug-44 / B-26 / $120,048 / $43,171 / $14,145 / $20,169 / $5,296
/ $7,749 / $210,578 / Costs based on uncompleted contracts
31-Aug-44 / A-20 / $61,510 / $29,945 / $4,388 / $14,155 / $3,204 /
$3,813 / $117,015 / Costs based on uncompleted contracts
31-Aug-44 / A-26 / $112,214 / $33,838 / $5,096 / $29,487 / $13,213
/ $3,939 / $197,787 / Costs based on uncompleted contracts
31-Aug-44 / P-38 / $70,168 / $19,344 / $5,386 / $6,383 / $2,914 /
$3,631 / $107,826 / Costs based on uncompleted contracts
31-Aug-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 /
$2,864 / $212,978 / Costs based on uncompleted contracts
31-Aug-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 /
$1,545 / $132,358 / Costs based on uncompleted contracts
31-Aug-44 / P-39 / $26,471 / $12,545 / $3,750 / $2,673 / $4,712 /
$2,633 / $52,784 / Costs based on uncompleted contracts
31-Aug-44 / P-40 / $26,352 / $10,503 / $3,110 / $2,068 / $2,646 /
$2,904 / $47,583 / Costs based on uncompleted contracts
31-Aug-44 / P-47 / $55,783 / $23,852 / $6,960 / $5,357 / $3,506 /
$2,948 / $98,406 / Costs based on uncompleted contracts
31-Aug-44 / P-51 / $27,889 / $17,545 / $4,391 / $2,236 / $2,574 /
$2,780 / $57,415 / Costs based on uncompleted contracts
31-Aug-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 /
$2,836 / $179,512 / Costs based on uncompleted contracts
31-Aug-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 /
$3,688 / $135,398 / Costs based on uncompleted contracts
31-Aug-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 /
$3,500 / $120,012 / Costs based on uncompleted contracts
31-Aug-44 / F-11 / $447,620 / $55,000 / $25,000 / $10,647 / $15 /
$10,500 / $548,782 / Costs based on uncompleted contracts
31-Aug-44 / OA-10 (PBY) / $216,250 / CF / CF / CF / $- / CF / $216,250
/ Costs based on uncompleted contracts
31-Aug-44 / C-54 / $250,515 / $59,398 / $8,729 / $9,762 / $15 /
$7,918 / $336,337 / Costs based on uncompleted contracts
31-Aug-44 / C-69 / $534,367 / $92,892 / $14,073 / $7,736 / $15 /
$7,067 / $656,150 / Costs based on uncompleted contracts
31-Aug-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 /
$6,761 / $1,088,451 / Costs based on uncompleted contracts
31-Aug-44 / C-87 / $155,000 / $28,334 / $9,840 / $22,811 / $15 /
$6,935 / $222,935 / Costs based on uncompleted contracts
31-Aug-44 / C-45 / $38,764 / $14,519 / $4,100 / $5,292 / $- /
$3,670 / $66,345 / Costs based on uncompleted contracts
31-Aug-44 / C-46 / $189,865 / $31,748 / $13,966 / $9,814 / $15 /
$9,277 / $254,685 / Costs based on uncompleted contracts
31-Aug-44 / C-47 / $61,062 / $18,707 / $3,804 / $8,160 / $15 /
$14,574 / $106,322 / Costs based on uncompleted contracts
31-Aug-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 /
$6,415 / $477,507 / Costs based on uncompleted contracts
31-Aug-44 / UC-61 / $9,394 / $3,187 / $150 / $207 / $- / $2,209
/ $15,147 / Costs based on uncompleted contracts
31-Aug-44 / C-64 / $26,521 / $5,769 / $1,062 / $2,056 / $14 /
$1,544 / $36,966 / Costs based on uncompleted contracts
31-Aug-44 / AT-7 / $41,275 / $10,286 / $2,050 / $8,250 / $- /
$2,299 / $64,160 / Costs based on uncompleted contracts
31-Aug-44 / AT-21 / $62,389 / $24,292 / $1,844 / $8,457 / $1,025 /
$2,758 / $100,765 / Costs based on uncompleted contracts
31-Aug-44 / AT-6 / $12,970 / $6,122 / $1,068 / $2,986 / $676 /
$1,318 / $25,140 / Costs based on uncompleted contracts
31-Aug-44 / AT-19 / $17,736 / $3,805 / $905 / $440 / $- / No info.
/ $22,886 / Costs based on uncompleted contracts
31-Aug-44 / L-4 / $2,277 / CF / CF / $150 / $- / $247 / $2,674 /
Costs based on uncompleted contracts
31-Aug-44 / L-5 / $6,359 / $1,956 / $149 / $463 / $26 / $263 /
$9,216 / Costs based on uncompleted contracts
31-Aug-44 / R-4 / $39,152 / $3,406 / $- / $667 / $- / $229 /
$43,454 / Costs based on uncompleted contracts
31-Aug-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
/ $60,471 / Costs based on uncompleted contracts
31-Aug-44 / R-6 / $41,142 / $4,663 / $- / $1,019 / $14 / $1,152
/ $47,990 / Costs based on uncompleted contracts
31-Aug-44 / CG-4A / $21,317 / $- / $- / $1,123 / $- / $155 /
$22,595 / 15 place. Costs based on uncompleted contracts
31-Jul-44 / B-29 / $478,180 / $100,406 / $12,181 / $125,919 /
$5,525 / $34,738 / $756,949 / Costs are weighted average of all Army
contracts from 1939 to date
31-Jul-44 / B-32 / $540,305 / $100,406 / $18,000 / $68,734 / $4,624
/ $34,150 / $766,219 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / B-17 / $157,484 / $37,480 / $11,755 / $48,939 / $5,999
/ $10,305 / $271,962 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / B-24 / $169,452 / $36,539 / $12,899 / $49,034 / $4,726
/ $9,752 / $282,402 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / B-25 / $93,690 / $29,589 / $5,201 / $20,514 / $8,041 /
$8,899 / $165,934 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / B-26 / $140,735 / $48,097 / $13,999 / $22,041 / $5,059
/ $12,590 / $242,521 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF /
$1,250 / $188,257 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-20 / $75,448 / $26,333 / $5,020 / $9,920 / $3,768 /
$3,828 / $124,317 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-26 / $112,264 / $33,838 / $5,096 / $29,488 / $13,213
/ $3,939 / $197,838 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / A-28 / $91,499 / $19,634 / $5,000 / $9,038 / $- /
$250 / $125,421 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-29 / $89,262 / $21,653 / $5,000 / $9,038 / $2,093 /
$250 / $127,296 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-30 / $110,586 / $28,427 / $4,664 / $3,250 / $2,773 /
$3,583 / $153,283 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-24 / $35,922 / $8,971 / $1,739 / $2,876 / $1,720 /
$5,197 / $56,425 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-25 / $67,492 / $14,001 / $3,988 / $6,692 / $2,303 /
$3,818 / $98,294 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-31 / $65,852 / $17,990 / $2,330 / $1,863 / $1,978 /
$250 / $90,263 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-35 / $56,166 / $14,552 / $2,353 / $3,026 / $2,270 /
$3,911 / $82,278 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 /
$2,632 / $2,516 / $60,204 / Costs are weighted average of all Army
contracts from 1939 to date
31-Jul-44 / P-38 / $73,607 / $21,096 / $5,822 / $7,748 / $3,531 /
$3,873 / $115,677 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 /
$2,864 / $212,978 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / P-61 / $191,831 / $49,392 / $11,841 / $18,144 / $6,308
/ $19,918 / $297,434 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 /
$3,260 / $143,076 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 /
$1,545 / $132,358 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / P-39 / $32,824 / $13,518 / $4,972 / $2,907 / $5,767 /
$4,305 / $64,293 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / P-40 / $29,515 / $13,905 / $3,266 / $2,325 / $3,237 /
$3,720 / $55,968 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / P-47 / $61,699 / $24,313 / $6,922 / $5,767 / $3,504 /
$3,303 / $105,508 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / P-51 / $28,984 / $17,328 / $4,887 / $2,322 / $2,493 /
$2,830 / $58,844 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / P-63 / $28,551 / $13,944 / $5,238 / $2,984 / $4,969 /
$2,636 / $58,322 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 /
$2,836 / $179,512 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 /
$3,688 / $135,398 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 /
$1,341 / $3,260 / $162,993 / Costs are weighted average of all Army
contracts from 1939 to date
31-Jul-44 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 /
$4,930 / $42,540 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / OA-10 (PBY) / $158,941 / $25,269 / in GFE / $24,975 /
$3,174 / $10,440 / $222,799 / Costs are weighted average of all Army
contracts from 1939 to date
31-Jul-44 / C-54 / $262,501 / $59,639 / $9,468 / $9,804 / $15 /
$7,824 / $349,251 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-69 / $534,331 / $92,892 / $15,120 / $7,736 / $15 /
$7,067 / $657,161 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 /
$6,761 / $1,088,451 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / C-87 / $196,474 / $31,517 / $9,840 / $22,099 / $211 /
$6,935 / $267,076 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-46 / $197,639 / $33,772 / $13,821 / $9,981 / $15 /
$9,315 / $264,543 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-47 / $73,749 / $17,428 / $4,616 / $5,707 / $16 /
$16,508 / $118,024 / Costs are weighted average of all Army contracts
from 1939 to date
31-Jul-44 / C-48 / $91,229 / $30,000 / $4,594 / $413 / $30 /
$8,460 / $134,726 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-49 / $104,870 / $25,269 / $4,594 / $1,854 / $15 /
$8,559 / $145,161 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-50 / $97,273 / $23,067 / $4,594 / $725 / No info. /
$7,849 / $133,508 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-51 / $100,689 / $18,324 / $4,594 / $725 / No info. /
$7,849 / $132,181 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-52 / $105,052 / $24,780 / $4,594 / $725 / No info. /
$7,849 / $143,000 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-53 / $107,124 / $22,431 / $4,627 / $3,096 / $26 /
$7,392 / $144,696 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-55 / $353,707 / CF / CF / CF / No info. / $7,849 /
$361,556 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / C-56 / $106,681 / CF / CF / CF / No info. / $7,849 /
$114,530 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / C-57 / $103,314 / CF / CF / CF / No info. / $8,136 /
$111,450 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / C-59 / $92,833 / $17,000 / CF / CF / $- / $250 /
$110,083 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / C-60 / $91,978 / $18,264 / $4,076 / $2,805 / $15 /
$5,396 / $122,534 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-68 / $139,966 / CF / CF / CF / No info. / $7,849 /
$147,815 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / C-76 / $135,489 / $14,690 / $5,950 / $9,280 / $15 /
$7,100 / $172,524 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 /
$6,415 / $477,507 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-45 / $39,667 / $14,478 / $3,231 / $5,257 / $30 /
$3,655 / $66,318 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-78 / $16,818 / $5,919 / $1,988 / $2,709 / $15 /
$6,348 / $33,797 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / C-43 / $18,687 / $6,000 / $1,104 / $896 / $- / $- /
$26,687 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / C-61 / $7,611 / $3,419 / $150 / $258 / $- / $2,209 /
$13,647 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / C-64 / $26,336 / $5,892 / $1,062 / $2,052 / $15 /
$1,544 / $36,901 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / AT-7 / $43,504 / $11,767 / $2,096 / $7,823 / $- /
$2,850 / $68,040 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / AT-8 / $25,646 / $7,438 / $1,932 / $5,455 / $- /
$1,230 / $41,701 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / AT-9 / $27,927 / $7,134 / $1,777 / $6,602 / $- /
$1,143 / $44,583 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / AT-10 / $26,886 / $7,702 / $1,957 / $5,577 / $- /
$1,543 / $43,665 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / AT-11 / $47,429 / $10,819 / $2,098 / $17,601 / $688 /
$1,541 / $80,176 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / AT-17 / $20,968 / $6,530 / $361 / $3,247 / $- /
$1,432 / $32,538 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / AT-18 / $83,890 / $18,666 / $4,600 / $6,279 / $987 /
$6,586 / $121,008 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / AT-20 / $44,737 / CF / CF / CF / $- / No info. / $44,737 /
Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / AT-21 / $62,381 / $24,292 / $1,844 / $8,458 / $1,025 /
$2,756 / $100,756 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / AT-6 / $14,188 / $6,187 / $1,068 / $3,107 / $706 /
$1,595 / $26,851 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / AT-16 / $18,565 / $6,262 / $1,192 / $1,476 / $- / CF /
$27,495 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / AT-19 / $22,793 / $5,338 / $1,320 / $3,041 / $- /
$1,230 / $33,722 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / BT-12 / $29,159 / $8,558 / $900 / $2,335 / $- /
$1,385 / $42,337 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / BT-13 / $12,657 / $6,838 / $901 / $2,630 / $- /
$1,363 / $24,389 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / BT-15 / $13,741 / $5,504 / $903 / $2,430 / $- /
$1,350 / $23,928 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / PT-13 / $6,054 / $3,178 / $553 / $1,180 / $- / $- /
$10,965 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / PT-17 / $5,756 / $2,393 / $373 / $829 / $- / $96 /
$9,447 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / PT-18 / $5,943 / $2,400 / $377 / $1,099 / $- / $- /
$9,819 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / PT-19 / $7,340 / $3,316 / $150 / $440 / $- / $97 /
$11,343 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / PT-22 / $8,729 / CF / CF / $240 / $- / $- / $8,969 /
Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / PT-23 / $10,632 / $3,231 / $187 / $870 / $- / $97 /
$15,017 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / PT-24 / $5,133 / Brit. Fr. / CF / CF / $- / $83 / $5,216
/ Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / PT-26 / $9,668 / $3,192 / $150 / $1,289 / $- / $91 /
$14,390 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / PT-27 / $5,341 / 2678 / CF / CF / $- / $83 / $8,102 /
Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / L-1 / $18,341 / $3,647 / $1,031 / $1,175 / $26 /
$1,200 / $25,420 / Costs are weighted average of all Army contracts from
1939 to date
31-Jul-44 / L-2 / $2,615 / CF / CF / $60 / $- / $247 / $2,922 /
Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / L-3 / $2,188 / CF / CF / $49 / $- / $247 / $2,484 /
Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / L-4 / $2,140 / CF / CF / $114 / $- / $247 / $2,501 /
Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / L-5 / $6,763 / $1,958 / $149 / $454 / $20 / $262 /
$9,606 / Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / L-6 / $6,070 / CF / CF / $11 / $- / No info. / $6,081 /
Costs are weighted average of all Army contracts from 1939 to date
31-Jul-44 / R-4 / $46,826 / $3,406 / $- / $689 / $- / $229 /
$51,150 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
/ $60,471 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jul-44 / R-6 / $41,142 / $4,663 / $- / $1,019 / $14 / $1,152
/ $47,990 / Costs are weighted average of all Army contracts from 1939 to
date
31-Jan-44 / YCG-13 / $54,792 / $- / $- / $1,683 / $- / $- /
$56,475 / 30 place. Costs are weighted average of all Army contracts from
1939 to date
31-Jan-44 / CG-4A / $23,693 / $- / $- / $1,123 / $- / $- /
$24,816 / 15 place, table total is 24,734. Costs are weighted average of
all Army contracts from 1939 to date
31-Jan-44 / CG-3A / $24,835 / $- / $- / $885 / $- / $- /
$25,720 / 9 Place. Costs are weighted average of all Army contracts from
1939 to date


Click here to read the complete article
Re: WWII Weapons cost, mostly aircraft.

<585ensuyg7xp.q6y7z49jq402.dlg@40tude.net>

  copy mid

https://www.novabbs.com/tech/article-flat.php?id=2816&group=rec.aviation.military#2816

  copy link   Newsgroups: rec.aviation.military
Path: rocksolid2!news.neodome.net!weretis.net!feeder8.news.weretis.net!eternal-september.org!reader02.eternal-september.org!.POSTED!not-for-mail
From: Solom...@citi.com (SolomonW)
Newsgroups: rec.aviation.military
Subject: Re: WWII Weapons cost, mostly aircraft.
Date: Sun, 10 Oct 2021 12:18:39 +1100
Organization: Truth with honesty
Lines: 643
Message-ID: <585ensuyg7xp.q6y7z49jq402.dlg@40tude.net>
References: <sjs2hi$mvb$1@dont-email.me>
Mime-Version: 1.0
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: 7bit
Injection-Info: reader02.eternal-september.org; posting-host="f33a261235de4389b62652bec470d96a";
logging-data="30502"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1/clFGtPiSkOR8KiXnyK8AkUKe0NQXUUYM="
User-Agent: 40tude_Dialog/2.0.15.1
Cancel-Lock: sha1:XhxUGvXzT+0f3wbpRsAsx1rySP0=
 by: SolomonW - Sun, 10 Oct 2021 01:18 UTC

On Sat, 9 Oct 2021 23:38:10 +1100, Geoffrey Sinclair wrote:

> Aircraft Unit costs, US Archives RG18 E 10 B 68, CF Contractor Furnished,
> GFE Government Furnished Equipment
> Date / Model / Airframe / Engines(s) / Propeller(s) / GFE / Ordnance /
> Communications / Total / Notes
> 28-Feb-43 / B-29 / $362,347 / $101,685 / $10,328 / $125,341 /
> $4,836 / $34,738 / $639,275 / Costs based on weighted average of
> uncompleted contracts
> 28-Feb-43 / B-32 / $522,613 / $101,685 / $23,310 / $68,947 / $3,247
> / $34,150 / $753,952 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / B-17 / $111,443 / $34,287 / $3,400 / $45,606 / $4,595
> / $9,040 / $208,371 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / B-24 / $115,338 / $32,659 / $4,220 / $49,781 / $3,205
> / $8,474 / $213,677 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / B-25 / $59,358 / $29,131 / $3,071 / $19,805 / $4,147 /
> $8,337 / $123,849 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / B-26 / $106,677 / $43,171 / $14,110 / $21,647 / $3,547
> / $7,749 / $196,901 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF /
> $1,250 / $188,257 / Costs based on final production contract
> 28-Feb-43 / A-20 / $44,366 / $30,795 / $4,428 / $18,364 / $2,345 /
> $3,813 / $104,111 / Costs based on final production contract
> 28-Feb-43 / A-26 / $106,807 / $33,466 / $3,700 / $29,277 / $14,067
> / $3,948 / $191,265 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / A-28 / $93,725 / $19,634 / $5,000 / $9,038 / $- /
> $250 / $127,647 / Costs based on final production contract
> 28-Feb-43 / A-29 / $91,688 / $23,000 / $5,000 / $9,038 / $2,093 /
> $250 / $131,069 / Costs based on final production contract
> 28-Feb-43 / A-30 / $103,962 / $29,104 / $4,668 / $3,712 / $2,737 /
> $6,777 / $150,960 / Costs based on final production contract
> 28-Feb-43 / A-24 / $33,172 / $9,103 / $1,739 / $1,997 / $1,640 /
> $4,800 / $52,451 / Costs based on final production contract
> 28-Feb-43 / A-25 / $67,492 / $13,559 / $3,988 / $1,997 / $2,240 /
> $3,500 / $92,776 / Costs based on final production contract
> 28-Feb-43 / A-31 / $67,230 / $13,859 / $2,330 / $1,863 / $1,978 /
> $250 / $87,510 / Costs based on final production contract
> 28-Feb-43 / A-35 / $36,874 / $13,351 / $2,353 / $3,026 / $2,270 /
> $3,911 / $61,785 / Costs based on final production contract
> 28-Feb-43 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 /
> $2,632 / $2,516 / $60,204 / Costs based on final production contract
> 28-Feb-43 / P-38 / $74,536 / $18,866 / $5,270 / $5,293 / $2,405 /
> $3,631 / $110,001 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-59 / $157,295 / $75,000 / $- / $2,001 / $4,034 /
> $2,864 / $241,194 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-61 / $154,899 / $44,714 / $6,352 / $14,507 / $4,684
> / $19,758 / $244,914 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 /
> $3,260 / $143,076 / Costs based on final production contract
> 28-Feb-43 / P-82 / $86,540 / $36,000 / $7,471 / $3,967 / $1,870 /
> $1,545 / $137,393 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-39 / $24,866 / $12,545 / $3,256 / $2,673 / $4,712 /
> $2,633 / $50,685 / Costs based on final production contract
> 28-Feb-43 / P-40 / $26,709 / $7,714 / $2,635 / $2,068 / $2,646 /
> $2,904 / $44,676 / Costs based on final production contract
> 28-Feb-43 / P-43 / $54,907 / $12,635 / $4,500 / $5,231 / $2,490 /
> $3,160 / $82,923 / Costs based on final production contract
> 28-Feb-43 / P-47 / $47,796 / $22,608 / $5,975 / $5,651 / $2,527 /
> $3,295 / $87,852 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-51 / $23,583 / $17,558 / $3,740 / $2,649 / $1,905 /
> $2,780 / $52,215 / Merlin Versions. Costs based on weighted average of
> uncompleted contracts
> 28-Feb-43 / P-63 / $28,049 / $13,183 / $3,540 / $3,693 / $4,296 /
> $2,640 / $55,401 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-66 / $70,503 / $17,509 / CF / CF / No info. /
> $3,160 / $91,172 / Costs based on final production contract
> 28-Feb-43 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 /
> $3,688 / $134,208 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / P-80 / $75,913 / $30,000 / $- / $2,944 / $1,897 /
> $2,317 / $113,071 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 /
> $1,341 / $3,260 / $162,993 / Costs based on weighted average of
> uncompleted contracts
> 28-Feb-43 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 /
> $10,500 / $603,932 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / OA-10 (PBY) / $216,250 / CF / CF / $559 / $- / CF /
> $216,809 / Costs based on weighted average of uncompleted contracts
> 28-Feb-43 / OA-11 / $175,000 / CF / CF / CF / $- / $- /
> $175,000 / Costs based on final production contract
> 28-Feb-43 / OA-12 (J2F) / $69,000 / CF / CF / CF / $- / $- /
> $69,000 / Costs based on final production contract
> 28-Feb-43 / TO-50 / $48,431 / CF / $250 / $919 / $26 / $1,200 /
> $50,826 / Costs based on final production contract
> 28-Feb-43 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 /
> $4,930 / $42,540 / Costs based on final production contract
> 28-Feb-43 / C-54 / $243,277 / $50,186 / $5,200 / $10,888 / $113 /
> $7,995 / $317,659 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-69 / $488,477 / $95,643 / $6,360 / $10,788 / $15 /
> $7,067 / $608,350 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-74 / $949,485 / $220,000 / $12,200 / $19,698 / $15 /
> $6,761 / $1,208,159 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-87 / $161,800 / $35,933 / $9,840 / $21,111 / $484 /
> $6,935 / $236,103 / Costs based on final production contract
> 28-Feb-43 / C-45 / $34,963 / $8,917 / $1,892 / $4,027 / No info. /
> $3,670 / $53,469 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-46 / $174,660 / $28,080 / $9,630 / $8,600 / $13 /
> $9,277 / $230,260 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-47 / $49,719 / $13,650 / $2,640 / $8,029 / $14 /
> $14,575 / $88,627 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-48 / $91,000 / $30,000 / $4,594 / $413 / $30 /
> $8,460 / $134,497 / Costs based on final production contract
> 28-Feb-43 / C-49 / $136,997 / CF / CF / $1,844 / $15 / $8,811 /
> $147,667 / Costs based on final production contract
> 28-Feb-43 / C-50 / $95,381 / $19,104 / $4,594 / $725 / No info. /
> $7,849 / $127,653 / Costs based on final production contract
> 28-Feb-43 / C-51 / $100,689 / $18,324 / $4,594 / $725 / No info. /
> $7,849 / $132,181 / Costs based on final production contract
> 28-Feb-43 / C-52 / $105,973 / $24,780 / $4,594 / $725 / No info. /
> $7,849 / $143,921 / Costs based on final production contract
> 28-Feb-43 / C-53 / $142,231 / CF / CF / $1,844 / $15 / $6,380 /
> $150,470 / Costs based on final production contract
> 28-Feb-43 / C-55 / $353,707 / CF / CF / CF / No info. / $7,849 /
> $361,556 / Costs based on final production contract
> 28-Feb-43 / C-56 / $108,797 / CF / CF / CF / No info. / No info. /
> $108,797 / Costs based on final production contract
> 28-Feb-43 / C-57 / $112,377 / CF / CF / CF / No info. / No info. /
> $112,377 / Costs based on final production contract
> 28-Feb-43 / C-59 / $92,833 / $17,000 / CF / CF / $- / $250 /
> $110,083 / Costs based on final production contract
> 28-Feb-43 / C-60 / $79,644 / $18,057 / $4,472 / $4,038 / $15 /
> $6,942 / $113,168 / Costs based on final production contract
> 28-Feb-43 / C-68 / $139,966 / CF / CF / CF / No info. / $7,849 /
> $147,815 / Costs based on final production contract
> 28-Feb-43 / C-76 / $137,125 / $14,690 / $5,950 / $9,280 / $15 /
> $7,100 / $174,160 / Costs based on final production contract
> 28-Feb-43 / C-78 / $16,873 / $5,852 / $1,988 / $2,657 / $15 /
> $6,348 / $33,733 / Costs based on final production contract
> 28-Feb-43 / C-82 / $427,244 / $36,000 / $3,880 / $8,592 / $15 /
> $6,415 / $482,146 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / C-43 / $18,732 / $5,074 / $1,104 / $1,162 / $- /
> $1,260 / $27,332 / Costs based on final production contract
> 28-Feb-43 / C-61 / $9,464 / $4,093 / CF / $207 / $- / $2,209 /
> $15,973 / Costs based on final production contract
> 28-Feb-43 / C-64 / $24,839 / $5,869 / $855 / $2,134 / $10 /
> $1,544 / $35,251 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / AT-7 / $41,719 / $14,519 / $2,050 / $8,250 / $- /
> $3,671 / $70,209 / Costs based on final production contract
> 28-Feb-43 / AT-8 / $25,646 / $7,438 / $1,932 / $5,455 / $- /
> $1,230 / $41,701 / Costs based on final production contract
> 28-Feb-43 / AT-9 / $27,603 / $6,947 / $1,700 / $7,042 / $- /
> $1,100 / $44,392 / Costs based on final production contract
> 28-Feb-43 / AT-10 / $29,600 / $7,534 / $1,665 / $5,271 / $- /
> $925 / $44,995 / Costs based on final production contract
> 28-Feb-43 / AT-11 / $36,447 / $14,519 / $1,965 / $8,250 / $650 /
> $2,636 / $64,467 / Costs based on final production contract
> 28-Feb-43 / AT-17 / $17,383 / $5,852 / $354 / $2,781 / $- /
> $1,100 / $27,470 / Costs based on final production contract
> 28-Feb-43 / AT-18 / $82,309 / $18,339 / $4,600 / $7,863 / $1,025 /
> $6,586 / $120,722 / Costs based on final production contract
> 28-Feb-43 / AT-20 / $44,737 / CF / CF / CF / $- / No info. /
> $44,737 / Costs based on final production contract
> 28-Feb-43 / AT-21 / $60,715 / $24,292 / $1,740 / $8,473 / $1,025 /
> $2,829 / $99,074 / Costs based on final production contract
> 28-Feb-43 / AT-6 / $11,500 / $5,869 / $853 / $2,409 / $270 /
> $1,318 / $22,219 / Costs based on weighted average of uncompleted
> contracts
> 28-Feb-43 / AT-16 / $18,594 / $5,880 / $1,068 / $1,874 / $- / CF
> / $27,416 / Costs based on final production contract
> 28-Feb-43 / AT-19 / $17,736 / $3,470 / $850 / $440 / $- / No
> info. / $22,496 / Costs based on final production contract
> 28-Feb-43 / BT-12 / $29,159 / $8,558 / $900 / $2,335 / $- /
> $1,385 / $42,337 / Costs based on final production contract
> 28-Feb-43 / BT-13 / $7,076 / $7,260 / $900 / $2,360 / $- / $1,352
> / $18,948 / Costs based on final production contract
> 28-Feb-43 / BT-15 / $13,778 / $5,542 / $900 / $2,313 / $- /
> $1,356 / $23,889 / Costs based on final production contract
> 28-Feb-43 / PT-13 / $6,045 / $4,227 / $645 / $1,374 / $- / $- /
> $12,291 / Costs based on weighted average of uncompleted contracts
> 28-Feb-43 / PT-17 / $5,530 / $2,350 / $357 / $602 / $- / $97 /
> $8,936 / Costs based on final production contract
> 28-Feb-43 / PT-18 / $5,943 / $2,400 / $377 / $1,099 / $- / $- /
> $9,819 / Costs based on final production contract
> 28-Feb-43 / PT-19 / $8,107 / $3,317 / $150 / $429 / $- / $97 /
> $12,100 / Costs based on final production contract
> 28-Feb-43 / PT-22 / $8,226 / CF / CF / $247 / $- / $- / $8,473 /
> Costs based on final production contract
> 28-Feb-43 / PT-23 / $11,059 / $3,316 / $215 / $755 / $- / $97 /
> $15,442 / Costs based on final production contract
> 28-Feb-43 / PT-24 / $5,133 / Brit. Fr. / CF / CF / $- / $83 / $5,216
> / Costs based on final production contract
> 28-Feb-43 / PT-26 / $10,285 / $3,187 / $150 / $1,347 / $- / $83
> / $15,052 / Costs based on final production contract
> 28-Feb-43 / PT-27 / $5,341 / $2,678 / CF / CF / $- / $83 /
> $8,102 / Costs based on final production contract
> 28-Feb-43 / L-1 / $20,368 / $3,860 / $1,125 / $1,191 / $26 /
> $1,200 / $27,770 / Costs based on final production contract
> 28-Feb-43 / L-2 / $2,667 / CF / CF / $84 / $- / $247 / $2,998
> / Costs based on final production contract
> 28-Feb-43 / L-3 / $2,138 / CF / CF / $11 / $- / $247 / $2,396
> / Costs based on final production contract
> 28-Feb-43 / L-4 / $2,227 / CF / CF / $152 / $- / $247 / $2,626
> / Costs based on final production contract
> 28-Feb-43 / L-5 / $6,164 / $1,956 / $352 / $427 / $10 / $263 /
> $9,172 / Costs based on weighted average of uncompleted contracts
> 28-Feb-43 / L-6 / $6,054 / CF / CF / $11 / $- / $61 / $6,126 /
> Total in table minus Comms cost. Costs based on final production contract
> 28-Feb-43 / R-4 / $39,317 / $3,401 / $- / $667 / $- / $229 /
> $43,614 / Costs based on weighted average of uncompleted contracts
> 28-Feb-43 / R-5 / $50,600 / $7,259 / $- / $1,208 / $10 / $1,460
> / $60,537 / Costs based on weighted average of uncompleted contracts
> 28-Feb-43 / R-6 / $41,222 / $4,663 / $- / $1,153 / $10 / $1,152
> / $48,200 / Costs based on weighted average of uncompleted contracts
> 30-Nov-44 / B-29 / $434,512 / $101,877 / $13,628 / $124,787 /
> $5,531 / $34,738 / $715,073 / Costs based on uncompleted contracts
> 30-Nov-44 / B-32 / $522,816 / $101,877 / $24,892 / $71,208 / $4,624
> / $34,150 / $759,567 / Costs based on uncompleted contracts
> 30-Nov-44 / B-17 / $125,464 / $34,875 / $6,487 / $46,413 / $5,686
> / $9,040 / $227,965 / Costs based on uncompleted contracts
> 30-Nov-44 / B-24 / $114,951 / $34,497 / $8,663 / $48,288 / $4,505
> / $8,474 / $219,378 / Costs based on uncompleted contracts
> 30-Nov-44 / B-25 / $89,920 / $29,131 / $3,071 / $19,703 / $5,837 /
> $8,337 / $155,999 / Costs based on uncompleted contracts
> 30-Nov-44 / B-26 / $110,260 / $43,171 / $14,110 / $21,647 / $5,028
> / $7,749 / $201,965 / Costs based on uncompleted contracts
> 30-Nov-44 / A-26 / $116,760 / $34,194 / $3,034 / $29,488 / $13,213
> / $3,939 / $200,628 / Costs based on uncompleted contracts
> 30-Nov-44 / P-38 / $74,673 / $18,867 / $5,270 / $6,199 / $2,901 /
> $3,631 / $111,541 / Costs based on uncompleted contracts
> 30-Nov-44 / P-59 / $129,296 / $75,000 / $- / $2,001 / $4,034 /
> $2,864 / $213,195 / Costs based on uncompleted contracts
> 30-Nov-44 / P-61 / $147,960 / $44,729 / $9,720 / $17,611 / $6,245
> / $19,758 / $246,023 / Costs based on uncompleted contracts
> 30-Nov-44 / P-82 / $86,540 / $36,000 / $9,200 / $3,229 / $444 /
> $1,545 / $136,958 / Costs based on uncompleted contracts
> 30-Nov-44 / P-47 / $49,420 / $22,608 / $5,257 / $5,210 / $3,506 /
> $3,295 / $89,296 / Costs based on uncompleted contracts
> 30-Nov-44 / P-51 / $25,795 / $17,558 / $2,555 / $2,234 / $2,559 /
> $2,780 / $53,481 / Costs based on uncompleted contracts
> 30-Nov-44 / P-63 / $29,194 / $13,183 / $3,282 / $3,373 / $5,140 /
> $2,638 / $56,810 / Costs based on uncompleted contracts
> 30-Nov-44 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 /
> $3,688 / $134,208 / Costs based on uncompleted contracts
> 30-Nov-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 /
> $3,500 / $120,012 / Costs based on uncompleted contracts
> 30-Nov-44 / YP-60 / $1,293,710 / $24,868 / $6,881 / $2,722 / $1,784
> / $4,673 / $1,334,638 / Costs based on uncompleted contracts
> 30-Nov-44 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 /
> $10,500 / $603,932 / Costs based on uncompleted contracts
> 30-Nov-44 / OA-10 (PBY) / $216,058 / CF / CF / $559 / $- / CF /
> $216,617 / Costs based on uncompleted contracts
> 30-Nov-44 / C-54 / $256,186 / $58,094 / $6,287 / $9,949 / $15 /
> $7,637 / $338,168 / Costs based on uncompleted contracts
> 30-Nov-44 / C-69 / $534,707 / $95,678 / $6,360 / $7,736 / $15 /
> $7,067 / $651,563 / Costs based on uncompleted contracts
> 30-Nov-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 /
> $6,761 / $1,088,451 / Costs based on uncompleted contracts
> 30-Nov-44 / C-45 / $36,585 / $10,705 / $2,050 / $4,894 / $- /
> $3,671 / $57,905 / Costs based on uncompleted contracts
> 30-Nov-44 / C-46 / $174,696 / $31,748 / $12,244 / $8,785 / $15 /
> $9,277 / $236,765 / Costs based on uncompleted contracts
> 30-Nov-44 / C-47 / $53,490 / $13,733 / $3,028 / $7,805 / $15 /
> $15,220 / $93,291 / Costs based on uncompleted contracts
> 30-Nov-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 /
> $6,415 / $477,507 / Costs based on uncompleted contracts
> 30-Nov-44 / C-64 / $24,839 / $5,933 / $1,055 / $2,056 / $14 /
> $1,544 / $35,441 / Costs based on uncompleted contracts
> 30-Nov-44 / AT-6 / $13,100 / $5,933 / $1,050 / $2,501 / $700 /
> $1,318 / $24,602 / Costs based on uncompleted contracts
> 30-Nov-44 / L-4 / $2,210 / CF / CF / $150 / $- / $247 / $2,607 /
> Costs based on uncompleted contracts
> 30-Nov-44 / L-5 / $6,199 / $1,956 / $149 / $445 / $27 / $263 /
> $9,039 / Costs based on uncompleted contracts
> 30-Nov-44 / R-4 / $39,152 / $3,401 / $- / $667 / $- / $229 /
> $43,449 / Costs based on uncompleted contracts
> 30-Nov-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
> / $60,471 / Costs based on uncompleted contracts
> 30-Nov-44 / R-6 / $41,145 / $4,663 / $- / $1,019 / $14 / $1,152
> / $47,993 / Costs based on uncompleted contracts
> 31-Aug-44 / B-29 / $469,269 / $100,406 / $12,433 / $125,863 /
> $5,526 / $34,738 / $748,235 / Airframe and engine costs subject to
> revision. Costs based on uncompleted contracts
> 31-Aug-44 / B-32 / $522,661 / $100,406 / $20,841 / $66,491 / $4,624
> / $34,150 / $749,173 / Costs based on uncompleted contracts
> 31-Aug-44 / B-17 / $129,150 / $35,521 / $11,247 / $47,425 / $5,966
> / $9,040 / $238,349 / Costs based on uncompleted contracts
> 31-Aug-44 / B-24 / $138,585 / $33,363 / $13,004 / $47,956 / $4,520
> / $8,474 / $245,902 / Costs based on uncompleted contracts
> 31-Aug-44 / B-25 / $94,229 / $29,104 / $5,096 / $15,392 / $10,827
> / $8,337 / $162,985 / Costs based on uncompleted contracts
> 31-Aug-44 / B-26 / $120,048 / $43,171 / $14,145 / $20,169 / $5,296
> / $7,749 / $210,578 / Costs based on uncompleted contracts
> 31-Aug-44 / A-20 / $61,510 / $29,945 / $4,388 / $14,155 / $3,204 /
> $3,813 / $117,015 / Costs based on uncompleted contracts
> 31-Aug-44 / A-26 / $112,214 / $33,838 / $5,096 / $29,487 / $13,213
> / $3,939 / $197,787 / Costs based on uncompleted contracts
> 31-Aug-44 / P-38 / $70,168 / $19,344 / $5,386 / $6,383 / $2,914 /
> $3,631 / $107,826 / Costs based on uncompleted contracts
> 31-Aug-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 /
> $2,864 / $212,978 / Costs based on uncompleted contracts
> 31-Aug-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 /
> $1,545 / $132,358 / Costs based on uncompleted contracts
> 31-Aug-44 / P-39 / $26,471 / $12,545 / $3,750 / $2,673 / $4,712 /
> $2,633 / $52,784 / Costs based on uncompleted contracts
> 31-Aug-44 / P-40 / $26,352 / $10,503 / $3,110 / $2,068 / $2,646 /
> $2,904 / $47,583 / Costs based on uncompleted contracts
> 31-Aug-44 / P-47 / $55,783 / $23,852 / $6,960 / $5,357 / $3,506 /
> $2,948 / $98,406 / Costs based on uncompleted contracts
> 31-Aug-44 / P-51 / $27,889 / $17,545 / $4,391 / $2,236 / $2,574 /
> $2,780 / $57,415 / Costs based on uncompleted contracts
> 31-Aug-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 /
> $2,836 / $179,512 / Costs based on uncompleted contracts
> 31-Aug-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 /
> $3,688 / $135,398 / Costs based on uncompleted contracts
> 31-Aug-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 /
> $3,500 / $120,012 / Costs based on uncompleted contracts
> 31-Aug-44 / F-11 / $447,620 / $55,000 / $25,000 / $10,647 / $15 /
> $10,500 / $548,782 / Costs based on uncompleted contracts
> 31-Aug-44 / OA-10 (PBY) / $216,250 / CF / CF / CF / $- / CF / $216,250
> / Costs based on uncompleted contracts
> 31-Aug-44 / C-54 / $250,515 / $59,398 / $8,729 / $9,762 / $15 /
> $7,918 / $336,337 / Costs based on uncompleted contracts
> 31-Aug-44 / C-69 / $534,367 / $92,892 / $14,073 / $7,736 / $15 /
> $7,067 / $656,150 / Costs based on uncompleted contracts
> 31-Aug-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 /
> $6,761 / $1,088,451 / Costs based on uncompleted contracts
> 31-Aug-44 / C-87 / $155,000 / $28,334 / $9,840 / $22,811 / $15 /
> $6,935 / $222,935 / Costs based on uncompleted contracts
> 31-Aug-44 / C-45 / $38,764 / $14,519 / $4,100 / $5,292 / $- /
> $3,670 / $66,345 / Costs based on uncompleted contracts
> 31-Aug-44 / C-46 / $189,865 / $31,748 / $13,966 / $9,814 / $15 /
> $9,277 / $254,685 / Costs based on uncompleted contracts
> 31-Aug-44 / C-47 / $61,062 / $18,707 / $3,804 / $8,160 / $15 /
> $14,574 / $106,322 / Costs based on uncompleted contracts
> 31-Aug-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 /
> $6,415 / $477,507 / Costs based on uncompleted contracts
> 31-Aug-44 / UC-61 / $9,394 / $3,187 / $150 / $207 / $- / $2,209
> / $15,147 / Costs based on uncompleted contracts
> 31-Aug-44 / C-64 / $26,521 / $5,769 / $1,062 / $2,056 / $14 /
> $1,544 / $36,966 / Costs based on uncompleted contracts
> 31-Aug-44 / AT-7 / $41,275 / $10,286 / $2,050 / $8,250 / $- /
> $2,299 / $64,160 / Costs based on uncompleted contracts
> 31-Aug-44 / AT-21 / $62,389 / $24,292 / $1,844 / $8,457 / $1,025 /
> $2,758 / $100,765 / Costs based on uncompleted contracts
> 31-Aug-44 / AT-6 / $12,970 / $6,122 / $1,068 / $2,986 / $676 /
> $1,318 / $25,140 / Costs based on uncompleted contracts
> 31-Aug-44 / AT-19 / $17,736 / $3,805 / $905 / $440 / $- / No info.
> / $22,886 / Costs based on uncompleted contracts
> 31-Aug-44 / L-4 / $2,277 / CF / CF / $150 / $- / $247 / $2,674 /
> Costs based on uncompleted contracts
> 31-Aug-44 / L-5 / $6,359 / $1,956 / $149 / $463 / $26 / $263 /
> $9,216 / Costs based on uncompleted contracts
> 31-Aug-44 / R-4 / $39,152 / $3,406 / $- / $667 / $- / $229 /
> $43,454 / Costs based on uncompleted contracts
> 31-Aug-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
> / $60,471 / Costs based on uncompleted contracts
> 31-Aug-44 / R-6 / $41,142 / $4,663 / $- / $1,019 / $14 / $1,152
> / $47,990 / Costs based on uncompleted contracts
> 31-Aug-44 / CG-4A / $21,317 / $- / $- / $1,123 / $- / $155 /
> $22,595 / 15 place. Costs based on uncompleted contracts
> 31-Jul-44 / B-29 / $478,180 / $100,406 / $12,181 / $125,919 /
> $5,525 / $34,738 / $756,949 / Costs are weighted average of all Army
> contracts from 1939 to date
> 31-Jul-44 / B-32 / $540,305 / $100,406 / $18,000 / $68,734 / $4,624
> / $34,150 / $766,219 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / B-17 / $157,484 / $37,480 / $11,755 / $48,939 / $5,999
> / $10,305 / $271,962 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / B-24 / $169,452 / $36,539 / $12,899 / $49,034 / $4,726
> / $9,752 / $282,402 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / B-25 / $93,690 / $29,589 / $5,201 / $20,514 / $8,041 /
> $8,899 / $165,934 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / B-26 / $140,735 / $48,097 / $13,999 / $22,041 / $5,059
> / $12,590 / $242,521 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF /
> $1,250 / $188,257 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-20 / $75,448 / $26,333 / $5,020 / $9,920 / $3,768 /
> $3,828 / $124,317 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-26 / $112,264 / $33,838 / $5,096 / $29,488 / $13,213
> / $3,939 / $197,838 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / A-28 / $91,499 / $19,634 / $5,000 / $9,038 / $- /
> $250 / $125,421 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-29 / $89,262 / $21,653 / $5,000 / $9,038 / $2,093 /
> $250 / $127,296 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-30 / $110,586 / $28,427 / $4,664 / $3,250 / $2,773 /
> $3,583 / $153,283 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-24 / $35,922 / $8,971 / $1,739 / $2,876 / $1,720 /
> $5,197 / $56,425 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-25 / $67,492 / $14,001 / $3,988 / $6,692 / $2,303 /
> $3,818 / $98,294 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-31 / $65,852 / $17,990 / $2,330 / $1,863 / $1,978 /
> $250 / $90,263 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-35 / $56,166 / $14,552 / $2,353 / $3,026 / $2,270 /
> $3,911 / $82,278 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 /
> $2,632 / $2,516 / $60,204 / Costs are weighted average of all Army
> contracts from 1939 to date
> 31-Jul-44 / P-38 / $73,607 / $21,096 / $5,822 / $7,748 / $3,531 /
> $3,873 / $115,677 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 /
> $2,864 / $212,978 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-61 / $191,831 / $49,392 / $11,841 / $18,144 / $6,308
> / $19,918 / $297,434 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 /
> $3,260 / $143,076 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 /
> $1,545 / $132,358 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-39 / $32,824 / $13,518 / $4,972 / $2,907 / $5,767 /
> $4,305 / $64,293 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-40 / $29,515 / $13,905 / $3,266 / $2,325 / $3,237 /
> $3,720 / $55,968 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-47 / $61,699 / $24,313 / $6,922 / $5,767 / $3,504 /
> $3,303 / $105,508 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-51 / $28,984 / $17,328 / $4,887 / $2,322 / $2,493 /
> $2,830 / $58,844 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-63 / $28,551 / $13,944 / $5,238 / $2,984 / $4,969 /
> $2,636 / $58,322 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 /
> $2,836 / $179,512 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 /
> $3,688 / $135,398 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 /
> $1,341 / $3,260 / $162,993 / Costs are weighted average of all Army
> contracts from 1939 to date
> 31-Jul-44 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 /
> $4,930 / $42,540 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / OA-10 (PBY) / $158,941 / $25,269 / in GFE / $24,975 /
> $3,174 / $10,440 / $222,799 / Costs are weighted average of all Army
> contracts from 1939 to date
> 31-Jul-44 / C-54 / $262,501 / $59,639 / $9,468 / $9,804 / $15 /
> $7,824 / $349,251 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-69 / $534,331 / $92,892 / $15,120 / $7,736 / $15 /
> $7,067 / $657,161 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 /
> $6,761 / $1,088,451 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / C-87 / $196,474 / $31,517 / $9,840 / $22,099 / $211 /
> $6,935 / $267,076 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-46 / $197,639 / $33,772 / $13,821 / $9,981 / $15 /
> $9,315 / $264,543 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-47 / $73,749 / $17,428 / $4,616 / $5,707 / $16 /
> $16,508 / $118,024 / Costs are weighted average of all Army contracts
> from 1939 to date
> 31-Jul-44 / C-48 / $91,229 / $30,000 / $4,594 / $413 / $30 /
> $8,460 / $134,726 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-49 / $104,870 / $25,269 / $4,594 / $1,854 / $15 /
> $8,559 / $145,161 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-50 / $97,273 / $23,067 / $4,594 / $725 / No info. /
> $7,849 / $133,508 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-51 / $100,689 / $18,324 / $4,594 / $725 / No info. /
> $7,849 / $132,181 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-52 / $105,052 / $24,780 / $4,594 / $725 / No info. /
> $7,849 / $143,000 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-53 / $107,124 / $22,431 / $4,627 / $3,096 / $26 /
> $7,392 / $144,696 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-55 / $353,707 / CF / CF / CF / No info. / $7,849 /
> $361,556 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-56 / $106,681 / CF / CF / CF / No info. / $7,849 /
> $114,530 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-57 / $103,314 / CF / CF / CF / No info. / $8,136 /
> $111,450 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-59 / $92,833 / $17,000 / CF / CF / $- / $250 /
> $110,083 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-60 / $91,978 / $18,264 / $4,076 / $2,805 / $15 /
> $5,396 / $122,534 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-68 / $139,966 / CF / CF / CF / No info. / $7,849 /
> $147,815 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-76 / $135,489 / $14,690 / $5,950 / $9,280 / $15 /
> $7,100 / $172,524 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 /
> $6,415 / $477,507 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-45 / $39,667 / $14,478 / $3,231 / $5,257 / $30 /
> $3,655 / $66,318 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-78 / $16,818 / $5,919 / $1,988 / $2,709 / $15 /
> $6,348 / $33,797 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / C-43 / $18,687 / $6,000 / $1,104 / $896 / $- / $- /
> $26,687 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-61 / $7,611 / $3,419 / $150 / $258 / $- / $2,209 /
> $13,647 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / C-64 / $26,336 / $5,892 / $1,062 / $2,052 / $15 /
> $1,544 / $36,901 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-7 / $43,504 / $11,767 / $2,096 / $7,823 / $- /
> $2,850 / $68,040 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-8 / $25,646 / $7,438 / $1,932 / $5,455 / $- /
> $1,230 / $41,701 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-9 / $27,927 / $7,134 / $1,777 / $6,602 / $- /
> $1,143 / $44,583 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-10 / $26,886 / $7,702 / $1,957 / $5,577 / $- /
> $1,543 / $43,665 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-11 / $47,429 / $10,819 / $2,098 / $17,601 / $688 /
> $1,541 / $80,176 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-17 / $20,968 / $6,530 / $361 / $3,247 / $- /
> $1,432 / $32,538 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-18 / $83,890 / $18,666 / $4,600 / $6,279 / $987 /
> $6,586 / $121,008 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-20 / $44,737 / CF / CF / CF / $- / No info. / $44,737 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / AT-21 / $62,381 / $24,292 / $1,844 / $8,458 / $1,025 /
> $2,756 / $100,756 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-6 / $14,188 / $6,187 / $1,068 / $3,107 / $706 /
> $1,595 / $26,851 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / AT-16 / $18,565 / $6,262 / $1,192 / $1,476 / $- / CF /
> $27,495 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / AT-19 / $22,793 / $5,338 / $1,320 / $3,041 / $- /
> $1,230 / $33,722 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / BT-12 / $29,159 / $8,558 / $900 / $2,335 / $- /
> $1,385 / $42,337 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / BT-13 / $12,657 / $6,838 / $901 / $2,630 / $- /
> $1,363 / $24,389 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / BT-15 / $13,741 / $5,504 / $903 / $2,430 / $- /
> $1,350 / $23,928 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / PT-13 / $6,054 / $3,178 / $553 / $1,180 / $- / $- /
> $10,965 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / PT-17 / $5,756 / $2,393 / $373 / $829 / $- / $96 /
> $9,447 / Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / PT-18 / $5,943 / $2,400 / $377 / $1,099 / $- / $- /
> $9,819 / Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / PT-19 / $7,340 / $3,316 / $150 / $440 / $- / $97 /
> $11,343 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / PT-22 / $8,729 / CF / CF / $240 / $- / $- / $8,969 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / PT-23 / $10,632 / $3,231 / $187 / $870 / $- / $97 /
> $15,017 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / PT-24 / $5,133 / Brit. Fr. / CF / CF / $- / $83 / $5,216
> / Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / PT-26 / $9,668 / $3,192 / $150 / $1,289 / $- / $91 /
> $14,390 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / PT-27 / $5,341 / 2678 / CF / CF / $- / $83 / $8,102 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / L-1 / $18,341 / $3,647 / $1,031 / $1,175 / $26 /
> $1,200 / $25,420 / Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jul-44 / L-2 / $2,615 / CF / CF / $60 / $- / $247 / $2,922 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / L-3 / $2,188 / CF / CF / $49 / $- / $247 / $2,484 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / L-4 / $2,140 / CF / CF / $114 / $- / $247 / $2,501 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / L-5 / $6,763 / $1,958 / $149 / $454 / $20 / $262 /
> $9,606 / Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / L-6 / $6,070 / CF / CF / $11 / $- / No info. / $6,081 /
> Costs are weighted average of all Army contracts from 1939 to date
> 31-Jul-44 / R-4 / $46,826 / $3,406 / $- / $689 / $- / $229 /
> $51,150 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
> / $60,471 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jul-44 / R-6 / $41,142 / $4,663 / $- / $1,019 / $14 / $1,152
> / $47,990 / Costs are weighted average of all Army contracts from 1939 to
> date
> 31-Jan-44 / YCG-13 / $54,792 / $- / $- / $1,683 / $- / $- /
> $56,475 / 30 place. Costs are weighted average of all Army contracts from
> 1939 to date
> 31-Jan-44 / CG-4A / $23,693 / $- / $- / $1,123 / $- / $- /
> $24,816 / 15 place, table total is 24,734. Costs are weighted average of
> all Army contracts from 1939 to date
> 31-Jan-44 / CG-3A / $24,835 / $- / $- / $885 / $- / $- /
> $25,720 / 9 Place. Costs are weighted average of all Army contracts from
> 1939 to date


Click here to read the complete article
Re: WWII Weapons cost, mostly aircraft.

<skc6ei$krp$1@dont-email.me>

  copy mid

https://www.novabbs.com/tech/article-flat.php?id=2822&group=rec.aviation.military#2822

  copy link   Newsgroups: rec.aviation.military
Path: rocksolid2!i2pn.org!eternal-september.org!reader02.eternal-september.org!.POSTED!not-for-mail
From: keithwil...@gmail.com (Keith Willshaw)
Newsgroups: rec.aviation.military
Subject: Re: WWII Weapons cost, mostly aircraft.
Date: Fri, 15 Oct 2021 16:24:01 +0100
Organization: A noiseless patient Spider
Lines: 14
Message-ID: <skc6ei$krp$1@dont-email.me>
References: <sjs2hi$mvb$1@dont-email.me>
<585ensuyg7xp.q6y7z49jq402.dlg@40tude.net>
Mime-Version: 1.0
Content-Type: text/plain; charset=UTF-8; format=flowed
Content-Transfer-Encoding: 7bit
Injection-Date: Fri, 15 Oct 2021 15:24:02 -0000 (UTC)
Injection-Info: reader02.eternal-september.org; posting-host="96062497dc9482a173043953c222810e";
logging-data="21369"; mail-complaints-to="abuse@eternal-september.org"; posting-account="U2FsdGVkX1+QdDPjZiYI78vNuQoJaIR9H+x66xpAutg="
User-Agent: Mozilla/5.0 (Windows NT 10.0; Win64; x64; rv:91.0) Gecko/20100101
Thunderbird/91.1.2
Cancel-Lock: sha1:+cFP1ViwmWJErFFQKcuAyzCE9ds=
In-Reply-To: <585ensuyg7xp.q6y7z49jq402.dlg@40tude.net>
 by: Keith Willshaw - Fri, 15 Oct 2021 15:24 UTC

On 10/10/2021 02:18, SolomonW wrote:

> Weapon costs are going up over time despite greater production, not sure
> whether its inflation or improvements in design mainly.
>

As one would expect, someone has to pay for the new factories, tooling,
materials etc. Willow Run for example was a brand new very large
facility that was only in full production for a few years. Ford built
the factory and sold it to the government then leased it back for the
duration of the war. Post war they simply ceased leasing it.

1
server_pubkey.txt

rocksolid light 0.9.8
clearnet tor